Illinois State Library

Electronic Documents of Illinois


Browse by TITLE

0  1  2  3  4  5  6  7  8  9  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z 
Search:
Q* in FirstWord [X]
05 01 2002 in DateCreated [X]
rss icon RSS
Results:  16 Items
Sorted by:  
Page: 1
XMLRecordID
000000042934 (2)
000000042936 (2)
000000042937 (2)
000000043206 (2)
000000043212 (2)
DateCreated
05 01 2002[X]
 

Title:  

Quarterly Report 1: Little Muddy River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is first in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Muddy River Watershed. The Illinois Environmental Protection Agency (IEPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. IEPA plans to complete the TMDLs for this watershed within the next 14 months. This quarterly report provides a brief description of what a TMDL is, the waterbodies that are scheduled for TMDL development, the standards and targets the TMDLs will aim to meet, public participation opportunities, project progress, and the next steps of the process to complete. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043206   Original UID: 22724Control Number: 0174 
  Documents:  20120613162713_little-muddy-1.pdf
 
 

Title:  

Quarterly Report 1: Little Muddy River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is first in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Muddy River Watershed. The Illinois Environmental Protection Agency (IEPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. IEPA plans to complete the TMDLs for this watershed within the next 14 months. This quarterly report provides a brief description of what a TMDL is, the waterbodies that are scheduled for TMDL development, the standards and targets the TMDLs will aim to meet, public participation opportunities, project progress, and the next steps of the process to complete. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043206   Original UID: 22724Control Number: 0174 
  Documents:  little-muddy-1.pdf
 
 

Title:  

Quarterly Report 1: Little Wabash River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is first in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Wabash River Watershed. The Illinois Environmental Protection Agency (IEPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. IEPA plans to complete the TMDLs for this watershed within the next 14 months. This quarterly report provides a brief description of what a TMDL is, the waterbodies that are scheduled for TMDL development, the standards and targets the TMDLs will aim to meet, public participation opportunities, project progress, and the next steps of the process to complete. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000042934   Original UID: 22464Control Number: 0174 
  Documents:  20120607162054_altamont-1.pdf
 
 

Title:  

Quarterly Report 1: Little Wabash River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is first in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Wabash River Watershed. The Illinois Environmental Protection Agency (IEPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. IEPA plans to complete the TMDLs for this watershed within the next 14 months. This quarterly report provides a brief description of what a TMDL is, the waterbodies that are scheduled for TMDL development, the standards and targets the TMDLs will aim to meet, public participation opportunities, project progress, and the next steps of the process to complete. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000042934   Original UID: 22464Control Number: 0174 
  Documents:  altamont-1.pdf
 
 

Title:  

Quarterly Report 1: Vandalia Lake Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is first in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Vandalia Lake Watershed. The Illinois Environmental Protection Agency (IEPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. IEPA plans to complete the TMDLs for this watershed within the next 14 months. This quarterly report provides a brief description of what a TMDL is, the waterbodies that are scheduled for TMDL development, the standards and targets the TMDLs will aim to meet, public participation opportunities, project progress, and the next steps of the process to complete. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043281   Original UID: 22788Control Number: 0174 
  Documents:  20120614142554_vandalia-1.pdf
 
 

Title:  

Quarterly Report 1: Vandalia Lake Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is first in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Vandalia Lake Watershed. The Illinois Environmental Protection Agency (IEPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. IEPA plans to complete the TMDLs for this watershed within the next 14 months. This quarterly report provides a brief description of what a TMDL is, the waterbodies that are scheduled for TMDL development, the standards and targets the TMDLs will aim to meet, public participation opportunities, project progress, and the next steps of the process to complete. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043281   Original UID: 22788Control Number: 0174 
  Documents:  vandalia-1.pdf
 
 

Title:  

Quarterly Report 2: Little Muddy River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is second in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Muddy River Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043207   Original UID: 22725Control Number: 0174 
  Documents:  little-muddy-2.pdf
 
 

Title:  

Quarterly Report 2: Little Wabash River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is second in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Wabash River Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000042936   Original UID: 22466Control Number: 0174 
  Documents:  20120607162308_altamont-2.pdf
 
 

Title:  

Quarterly Report 2: Little Wabash River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is second in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Wabash River Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000042936   Original UID: 22466Control Number: 0174 
  Documents:  altamont-2.pdf
 
 

Title:  

Quarterly Report 2: Vandalia Lake Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is second in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Vandalia Lake Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043282   Original UID: 22789Control Number: 0174 
  Documents:  20120614142738_vandalia-2.pdf
 
 

Title:  

Quarterly Report 2: Vandalia Lake Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is second in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Vandalia Lake Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043282   Original UID: 22789Control Number: 0174 
  Documents:  vandalia-2.pdf
 
 

Title:  

Quarterly Report 3: Little Muddy River Watershed

 
 Volume/Number:    
 Time Period Covered:  December 2001-February 2002  
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is third in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Muddy River Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of progress during the months of December 2001 through February 2002. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043212   Original UID: 22727Control Number: 0174 
  Documents:  20120613163111_little-muddy-3.pdf
 
 

Title:  

Quarterly Report 3: Little Muddy River Watershed

 
 Volume/Number:    
 Time Period Covered:  December 2001-February 2002  
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is third in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Muddy River Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of progress during the months of December 2001 through February 2002. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043212   Original UID: 22727Control Number: 0174 
  Documents:  little-muddy-3.pdf
 
 

Title:  

Quarterly Report 3: Little Wabash River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is third in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Wabash River (Altamont New Reservoir) Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of progress during the months of December 2001 through February 2002. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000042937   Original UID: 22467Control Number: 0174 
  Documents:  20120607162505_altamont-3.pdf
 
 

Title:  

Quarterly Report 3: Little Wabash River Watershed

 
 Volume/Number:    
 Time Period Covered:    
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is third in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Little Wabash River (Altamont New Reservoir) Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of progress during the months of December 2001 through February 2002. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000042937   Original UID: 22467Control Number: 0174 
  Documents:  altamont-3.pdf
 
 

Title:  

Quarterly Report 3: Vandalia Lake Watershed

 
 Volume/Number:    
 Time Period Covered:  December 2001-February 2002  
 Issuing Agency:  Environmental Protection AgencyBureau of Water 
 Description:  This is third in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Vandalia Lake Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of progress during the months of December 2001 through February 2002. 
 Date Created:  05 01 2002 
 Agency ID:   
 ISL ID:  000000043283   Original UID: 22790Control Number: 0174 
  Documents:  vandalia-3.pdf