Illinois State Library

Electronic Documents of Illinois


Search:
H* in FirstWord [X]
000000051270 in XMLRecordID [X]
rss icon RSS
Results:  1 Item
Sorted by:  
Page: 1
XMLRecordID
000000051270[X]
DateCreated
 

Title:  

Horseshoe Lake Watershed Total Maximum Daily Load: Stage 1 Report, Draft

 
 Volume/Number:  2013 November 7 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  11-07-2013 
 Agency ID:   
 ISL ID:  000000051270   Original UID: 172102 FIRST WORD: Horseshoe