Organization • | Illinois Department of Transportation | [X] |
| |  | Title: | | | | Volume/Number: | | | | Issuing Agency: | Illinois Department of Transportation | 0175 | | Description: | Roadway signs are the major traffic control device the department uses along its roadways to communicate to motorists. In order to provide this important information, and as a result of the improvements and cost reductions of prismatic retroreflective sign sheeting materials, the Central Bureau of Operations has updated the departments retroreflective sign sheeting policy. | | | Agency ID: | | | | ISL ID: | 000000057171 Original UID: 178243 | | | Documents: | FABRICATIONOFHIGHWAYSIGNSPOLICY2016Feb.pdf
| |
|  | Title: | | | | Volume/Number: | | | | Issuing Agency: | Illinois Department of Transportation | 0175 | | Description: | Roadway signs are the major traffic control device the department uses along its roadways to communicate to motorists. In order to provide this important information, and as a result of the improvements and cost reductions of prismatic retroreflective sign sheeting materials, the Central Bureau of Operations has updated the departments retroreflective sign sheeting policy. | | | Agency ID: | | | | ISL ID: | 000000057063 Original UID: 178095 | | | Documents: | FABRICATIONOFHIGHWAYSIGNSPOLICY.pdf
| |
|  | Title: | | | | Volume/Number: | 2012 September 17 | | | Issuing Agency: | Illinois Department of Transportation | 0275 | | Description: | The Illinois Department of Transportation announced that on Sunday, September 23rd from 6:00 AM until 7:00 PM, First Street will be reduced to one lane traffic between Exchange Avenue and St. Clair Avenue (IL 3) in Fairmont City / East St. Louis, weather permitting. Two-way traffic will be maintained using flaggers. | | | Agency ID: | | | | ISL ID: | 000000045276 Original UID: 24637 | | | Documents: | 76C50%20rel%2009-17-12%20Install%20Beams.pdf
| |
|  | Title: | | | | Volume/Number: | 2019 October 10 | | | Issuing Agency: | Illinois Department of Transportation | 0196 | | Description: | Press Release: With the onset of autumn, the school year is in full swing, pumpkin lattes aresteaming and Illinois deer are feeling amorous. | | | Agency ID: | | | | ISL ID: | 000000087447 Original UID: 198432 | | | Documents: | 20695-Fall_driving_can_get_risky_when_deer_get_frisky.pdf
| |
|  | Title: | | | | Volume/Number: | 2018 February 1 | | | Issuing Agency: | Illinois Department of Transportation | 0196 | | Description: | Press Release: As Americas football fans gear up for one of the most anticipated sporting events of the year, the Illinois Department of Transportation and Illinois State Police are taking a timeout to spread an important safety message: Fans dont let fans drive drunk. | | | Agency ID: | | | | ISL ID: | 000000081659 Original UID: 194223 | | | Documents: | 15320-IDOT_Fans_Dont_Let_Fans_Drive_Drunk_Release.pdf
| |
|  | Title: | | | | Volume/Number: | 2008 October | | | Issuing Agency: | Illinois Department of Transportation | 0175 | | Description: | This guide provides information and drawings intended to help IDOT personnel and others involved in transportation projects identify fasteners meeting code and specification requirements. | | | Agency ID: | | | | ISL ID: | 000000021602 Original UID: 10891 | | | Documents: | fasteneridentificationguideOctober2008.pdf
| |
|  | Title: | | | | Volume/Number: | 2011 March 10 | | | Issuing Agency: | Illinois Department of Transportation | 0275 | | Description: | In the next week, weather permitting, traffic on the Fayette Avenue interchange will be altered dramatically. | | | Agency ID: | | | | ISL ID: | 000000035022 Original UID: 16455 | | | Documents: | 20110316211820_74293pressrelease.docx
| |
|  | Title: | | | | Volume/Number: | 2010 November 5 | | | Issuing Agency: | Illinois Department of Transportation | 0275 | | Description: | The Illinois Department of Transportation has announced that construction work will begin on the reconstruction of the Fayette Avenue interchange on November 15, 2010. Preliminary layout work for traffic control will begin on Monday November 8, 2010. | | | Agency ID: | | | | ISL ID: | 000000030249 Original UID: 14156 | | | Documents: | 20101109212410_74293PressRelease11-05-10.docx
| |
|  | Title: | | | | Volume/Number: | 2010 May | | | Issuing Agency: | Illinois Department of Transportation | 0175 | | Description: | Brochure describing federal alcohol and drug testing requirements, information for motor carriers. | | | Agency ID: | | | | ISL ID: | 000000038117 Original UID: 18925 | | | Documents: | Federal_Alcohol_and_Drug_Testing_Requirements_Brochure_051710.pdf
| |
|  | Title: | | | | Volume/Number: | 2009 September | | | Issuing Agency: | Illinois Department of Transportation | 0175 | | Description: | As part of the Highway Safety Improvement Program (HSIP), states are required to submit an annual report to the Federal Highway Administration (FHWA) describing at least five percent of highway locations exhibiting the most pressing safety needs. This Five Percent Report will help Illinois is to gain an understanding of the nature and extent of safety problems, to provide guidance on where safety investments are needed, and to provide a basis for tracking the progress toward improving safety in the state. | | | Agency ID: | | | | ISL ID: | 000000049723 Original UID: 170919 | | | Documents: | FederalHighwayAdministrationHighwaySafetyImprovementProgramFivePercentReport2009.pdf
| |
| | Title: | | | | Volume/Number: | | | | Issuing Agency: | Illinois Department of Transportation | | | Description: | As part of the Highway Safety Improvement Program (HSIP), states are required to submit an annual report to the Federal Highway Administration (FHWA) describing at least five percent of highway locations exhibiting the most pressing safety needs. This Five Percent Report will help Illinois is to gain an understanding of the nature and extent of safety problems, to provide guidance on where safety investments are needed, and to provide a basis for tracking the progress toward improving safety in the state. | | | Agency ID: | | | | ISL ID: | 000000049896 Original UID: | |
|  | Title: | | | | Volume/Number: | 2012 April 11 | | | Issuing Agency: | Illinois Department of Transportation | 0275 | | Description: | The Illinois Department of Transportation announced that a project to remove and replace the Fifth Avenue bridge over Silver Creek in Melrose Park is scheduled to begin, weather permitting, on Monday, April 16. | | | Agency ID: | | | | ISL ID: | 000000042736 Original UID: 22261 | | | Documents: | 20120604193408_411125thAve.MelrosePark.pdf
| |
|  | Title: | | | | Volume/Number: | 2014 Septenber 26 | | | Issuing Agency: | Illinois Department of Transportation | 0283 | | Description: | The Federal Highway Administration (FHWA) today published the Illiana Corridor Tier Two Final Environmental Impact Statement (EIS), which recommends a new 50-mile toll road that will connect Interstate 55 near Wilmington, Ill., with Interstate 65 near Lowell, Ind. The reports recommendation comes after nearly four years of the Illinois Department of Transportation (IDOT) and the Indiana Department of Transportation (INDOT) working comprehensively with all impacted parties throughout the region. | | | Agency ID: | 1140**14 | | | ISL ID: | 000000052756 Original UID: 173976 | | | Documents: | 092614IDOTIllianaFEISpressreleaseFINAL.doc
| |
|  | Title: | | | | Volume/Number: | 2011 July 13 | | | Issuing Agency: | Illinois Department of Transportation | 0275 | | Description: | July 18 through July 21 the eastbound I-74 to southbound I-57 (ramp CA) July 21 and 22 the westbound I-74 to northbound I-57 (ramp DB) July 25 through July 27 the northbound I-57 to westbound I-74 (ramp AC) July 27 and July 28 the southbound I-57 to eastbound I-74 (ramp BD) July 28 - 8 PM to July 29 7 AM the westbound I-74 to southbound I-57 (ramp DA) This ramp is being done at night due to the high volume of traffic during daylight hours. Southbound I-57 will be reduced to one lane of traffic during this time period also. | | | Agency ID: | | | | ISL ID: | 000000036706 Original UID: 17867 | | | Documents: | 20110718190515_071311.doc
| |
|  | Title: | | | | Volume/Number: | 2018 September 18 | | | Issuing Agency: | Illinois Department of Transportation | 0196 | | Description: | Press Release: Less than one week remains to vote for the Illinois Department of Transportation's Interstate 55-Lake Shore Drive interchange reconstruction as the country's top transportation project. If the project wins, IDOT will donate the $10,000 in prize money for a local nonprofit to the Special Olympics. | | | Agency ID: | | | | ISL ID: | 000000082736 Original UID: 195434 | | | Documents: | 18170-Final_week_to_vote_for_IDOT_project_as_best_in_nation.pdf
| |
|  | Title: | | | | Volume/Number: | 2014 October 6 | | | Issuing Agency: | Illinois Department of Transportation | 0283 | | Description: | The Illinois Department of Transportation (IDOT) announced tonight that the new Morgan Street bridge is now open to traffic. Morgan Street is the first of the nine major bridges crossing the expressway system near downtown Chicago that are being rebuilt as part of Governor Pat Quinns $420 million reconstruction of the Jane Byrne Interchange. | | | Agency ID: | 1186**14 | | | ISL ID: | 000000054341 Original UID: 175697 | | | Documents: | 100614IDOTMorganStreetBridgeReopens.doc
| |
|  | Title: | | | | Volume/Number: | 2012 | | | Issuing Agency: | Illinois Department of Transportation | 0275 | | Description: | The Illinois Department of Transportation announces today that First Street (US 67) in Milan will be closed at the I-280 overpass on Tuesday night, April 24, 2012. The roadway will be closed from 6:00 p.m. Tuesday evening until 6:00 a.m. Wednesday morning to allow for the removal of the westbound I-280 bridge over First Street (US 67). | | | Agency ID: | April 20 | | | ISL ID: | 000000042776 Original UID: 22306 | | | Documents: | 20120605193435_Nr19-12.pdf
| |
|  | Title: | | | | Volume/Number: | | | | Issuing Agency: | Illinois Department of Transportation | 0175 | | Description: | Handbook to assist IDOT employees and local municipalities in understanding flagger duties. Flaggers have the direct responsibility for the safe passage of traffic in a work area. The lives of workers, the traveling public and the flagger depend upon the alertness and ability of the flagger to control traffic. | | | Agency ID: | | | | ISL ID: | 000000049696 Original UID: 170891 | | | Documents: | FlaggerHandbook2006.pdf
| |
|  | Title: | | | | Volume/Number: | 2010 | | | Issuing Agency: | Illinois Department of Transportation | 0175 | | Description: | Handbook to assist IDOT employees and local municipalities in understanding flagger duties. Flaggers have the direct responsibility for the safe passage of traffic in a work area. The lives of workers, the traveling public and the flagger depend upon the alertness and ability of the flagger to control traffic. | | | Agency ID: | | | | ISL ID: | 000000049695 Original UID: 170890 | | | Documents: | FlaggerHandbook2010.pdf
| |
|  | Title: | | | | Volume/Number: | 2014 June 25 | | | Issuing Agency: | Illinois Department of Transportation | 0283 | | Description: | The Illinois Department of Transportation (IDOT) announced today that in an effort to improve safety at intersections, flashing yellow arrow traffic signals are being installed at numerous Wabash Avenue intersections in Springfield. Two flashing yellow arrow traffic signals were activated on Tuesday at the east and west White Oaks Mall entrances. The four remaining signals, between Veterans Parkway and MacArthur Boulevard, are expected to be installed and operational by Friday. | | | Agency ID: | 737**14 | | | ISL ID: | 000000053457 Original UID: 174735 | | | Documents: | 062514IDOTSpringfieldFlashingYellowArrowsWabash.doc
| |
|