Illinois State Library

Electronic Documents of Illinois


Search:
T* in FirstWord [X]
Illinois Environmental Protection Agency, Bureau of Water in Organization [X]
rss icon RSS
Results:  61 Items
Sorted by:  
Page: Prev  1 2 3 4  Next
SiteTitle
TMDL Development for Bonpas Creek Watershed (1)
TMDL Development for Evergreen Lake: Quarterly Report (1)
TMDL Development for Evergreen Lake: Quarterly Report #1 (1)
TMDL Development for Galena/Sinsinawa Rivers Watershed (1)
TMDL Development for Homer Lake in the Salt Fork Vermilion River Watershed, Illinois: Stage Three Report: TMDL Development (1)
TMDL Development for Horseshoe Lake Watershed (1)
TMDL Development for Lake Canton Watershed (1)
TMDL Development for Lake Michigan Beaches (1)
TMDL Development for Lake Springfield Watershed (1)
TMDL Development for Ohio River Watershed (1)
TMDL Development for Pecatonica River Watershed (1)
TMDL Development for Prairie Creek/Langan Creek Watershed (1)
TMDL Development for Rend Lake Watershed (1)
TMDL Development for Upper Big Muddy River Watershed (1)
TMDL Development for Vermont City Reservoir/Sugar Creek Watershed (1)
TMDL Development for the Cedar Creek/Cedar Lake Watershed, Illinois: Draft Report for IEPA Review (1)
TMDL Development for the Crab Orchard Creek Watershed, Illinois: Stage Three Report Public Review Draft (1)
TMDL Development for the Crooked Creek Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Final Report: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Public Review Draft Report: Stage Three Report: Lake Oakland TMDL Development (1)
TMDL Development for the Little Vermilion River Watershed: Final Report (2)
TMDL Development for the Little Wabash River Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the Little Wabash River Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Mt. Olive New Lake, Mt. Olive Old Lake, and Staunton Lake Watersheds: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Salt Fork Vermilion River Watershed: Stage One Report: Watershed Characterization and Water Quality Analysis (1)
TMDL Development for the Shoal Creek Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the South Fork Saline River/Lake of Egypt Watershed, Illinois: Public Review Draft Report (1)
TMDL Scoping Report Development for Lake Michigan (nearshore) Mercury and Polychlorinated Biphenyls (1)
TMDL and LRS Development for Middle Illinois River Watershed (1)
Tampier Lake/Saganashkee Slough Watersheds Stage One TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds Stage Three TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds TMDL Report (1)
Thorn Creek Watershed Based Plan (1)
Thorn Creek Watershed TMDL Stage 1 Report (1)
Total Maximum Daily Load Development for Altamont New Reservoir Watershed (1)
Total Maximum Daily Load Development for Beaucoup Creek Watershed (1)
Total Maximum Daily Load Development for Big Muddy River #1 Watershed (1)
Total Maximum Daily Load Development for Bonnie Creek Watershed (1)
Total Maximum Daily Load Development for Casey Fork Watershed (1)
Total Maximum Daily Load Development for Dutchman Creek Watershed (1)
Total Maximum Daily Load Development for Fox River (2)
Total Maximum Daily Load Development for Little Muddy River Watershed: Draft Final Report (1)
Total Maximum Daily Load Development for Vandalia Lake Watershed: Draft Final Report (1)
Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report (2)
Total Maximum Daily Load Evergreen Lake Watershed: Stage Three Draft Report (1)
Total Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final (1)
Total Maximum Daily Load, Shoreline Segments in Chicago, Cook County, Illinois: 29 Segments from Juneway Terrace Park Beach to Calumet South Beach (1)
Total Maximum Daily Load, Shoreline Segments in Lake County, Illinois: 9 Segments from North Point Marina Beach to Highland Park Rosewood Beach (1)
Total Maximum Daily Loads for Salt Creek, Illinois: Final Report (1)
Total Maximum Daily Loads for West Branch DuPage River, Illinois (2)
Total Maximum Daily Loads for the East Branch of the DuPage River, Illinois (1)
Total maximum daily load, shoreline segments in Suburban Cook County, Illinois: 13 Segments from Glencoe Park Beach to Evanston South Beach (1)
Triennial Capacity Development Report (1)
Triennial Capacity Development Report, 2011 (1)
Triennial Capacity Development Report: Safe Drinking Water: Leveraging Resources and Planning for the Future, 2008 (1)
Organization
Illinois Environmental Protection Agency, Bureau of Water[X]
XMLRecordID
000000040719 (1)
000000040722 (1)
000000040723 (1)
000000040725 (1)
000000040726 (1)
DateCreated
21:

Title:  

Total Maximum Daily Load Development for Dutchman Creek Watershed

 
 Volume/Number:  2003 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  10 29 2003 
 Agency ID:   
 ISL ID:  000000043182   Original UID: 22696 FIRST WORD: Total 
22:

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report

 
 Volume/Number:  2005 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043183   Original UID: 22697 FIRST WORD: Total 
23:

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report

 
 Volume/Number:  2005 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043184   Original UID: 22697 FIRST WORD: Total 
24:

Title:  

Total Maximum Daily Load Development for Little Muddy River Watershed: Draft Final Report

 
 Volume/Number:  2004 January 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  01 16 2004 
 Agency ID:   
 ISL ID:  000000043205   Original UID: 22723 FIRST WORD: Total 
25:

Title:  

Total Maximum Daily Load Development for Vandalia Lake Watershed: Draft Final Report

 
 Volume/Number:  2003 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  10 28 2003 
 Agency ID:   
 ISL ID:  000000043285   Original UID: 22792 FIRST WORD: Total 
26:

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage Three Draft Report

 
 Volume/Number:  2005 July 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 3 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  07 21 2005 
 Agency ID:   
 ISL ID:  000000043388   Original UID: 22879 FIRST WORD: Total 
27:

Title:  

Total Maximum Daily Load, Shoreline Segments in Lake County, Illinois: 9 Segments from North Point Marina Beach to Highland Park Rosewood Beach

 
 Volume/Number:  2013  
 Issuing Agency:   
 Description:  This report documents the analysis and findings of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  05-13-2013 
 Agency ID:   
 ISL ID:  000000055935   Original UID: 176889 FIRST WORD: Total 
28:

Title:  

Total maximum daily load, shoreline segments in Suburban Cook County, Illinois: 13 Segments from Glencoe Park Beach to Evanston South Beach

 
 Volume/Number:  2013  
 Issuing Agency:   
 Description:  This report documents the analysis and findings of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  05-13-2013 
 Agency ID:   
 ISL ID:  000000055936   Original UID: 176890 FIRST WORD: Total 
29:

Title:  

Total Maximum Daily Load, Shoreline Segments in Chicago, Cook County, Illinois: 29 Segments from Juneway Terrace Park Beach to Calumet South Beach

 
 Volume/Number:  2013  
 Issuing Agency:   
 Description:  This report documents the analysis and findings of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  05-13-2013 
 Agency ID:   
 ISL ID:  000000055937   Original UID: 176891 FIRST WORD: Total 
30:

Title:  

TMDL Development for Lake Michigan Beaches

 
 Volume/Number:  2012 February 
 Issuing Agency:   
 Description:  Over the last 30 years, waters in Illinois have been monitored for chemical, biological and physical conditions. In some cases, the conditions of those rivers and lakes fall short of the need to support basic water quality use goals. These waters are deemed impaired since they cannot meet use expectations set for them under state and federal law. When this happens Total Maximum Daily Load (TMDL) reports are developed for impaired waters to determine the maximum amount of a pollutant a water body can receive and still meet water quality standards and support its designated uses. Designated uses include aquatic life, public water supply, swimming, recreation, fish consumption, and aesthetic quality. The Illinois EPA makes the decision to list a beach as not meeting its Primary Contact use of swimming and recreation based on the Illinois Department of Public Health beach closings. 
 Date Created:  02 14 2012 
 Agency ID:   
 ISL ID:  000000040737   Original UID: 20909 FIRST WORD: TMDL 
31:

Title:  

TMDL Development for the Cedar Creek/Cedar Lake Watershed, Illinois: Draft Report for IEPA Review

 
 Volume/Number:  2007 August 13 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  08 13 2007 
 Agency ID:   
 ISL ID:  000000043157   Original UID: 22672 FIRST WORD: TMDL 
32:

Title:  

TMDL Development for the Crab Orchard Creek Watershed, Illinois: Stage Three Report Public Review Draft

 
 Volume/Number:  2008 February 28 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  02 28 2008 
 Agency ID:   
 ISL ID:  000000043169   Original UID: 22683 FIRST WORD: TMDL 
33:

Title:  

TMDL Development for the Crooked Creek Watershed, Illinois: Public Review Draft

 
 Volume/Number:  2008 January 24 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  01 24 2008 
 Agency ID:   
 ISL ID:  000000043171   Original UID: 22685 FIRST WORD: TMDL 
34:

Title:  

TMDL Development for Evergreen Lake: Quarterly Report #1

 
 Volume/Number:    
 Issuing Agency:   
 Description:  A Total Maximum Daily Load (TMDL) is being completed for Evergreen Lake. The TMDL development is in the Stage 1 phase, which consists of Watershed Characterization, Data Analysis, and Methodology Selection. Currently data is being collected for the watershed characterization and data analysis. This update provides an overview of data collected to date. 
 Date Created:  07 26 2004 
 Agency ID:   
 ISL ID:  000000043185   Original UID: 22699 FIRST WORD: TMDL 
35:

Title:  

TMDL and LRS Development for Middle Illinois River Watershed

 
 Volume/Number:  2011 November 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  11 17 2011 
 Agency ID:   
 ISL ID:  000000043199   Original UID: 22714 FIRST WORD: TMDL 
36:

Title:  

TMDL Development for the Little Vermilion River Watershed: Final Report

 
 Volume/Number:  2005 April 8 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043215   Original UID: 22740 FIRST WORD: TMDL 
37:

Title:  

TMDL Development for the Little Vermilion River Watershed: Final Report

 
 Volume/Number:  2005 April 8 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043216   Original UID: 22740 FIRST WORD: TMDL 
38:

Title:  

TMDL Development for the Little Wabash River Watershed, Illinois: Draft Report for Public Review

 
 Volume/Number:  2007 July 30 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  07 30 2007 
 Agency ID:   
 ISL ID:  000000043220   Original UID: 22743 FIRST WORD: TMDL 
39:

Title:  

TMDL Development for the Little Wabash River Watershed, Illinois: Public Review Draft

 
 Volume/Number:  2008 January 24 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  01 24 2008 
 Agency ID:   
 ISL ID:  000000043227   Original UID: 22750 FIRST WORD: TMDL 
40:

Title:  

TMDL Development for the Mt. Olive New Lake, Mt. Olive Old Lake, and Staunton Lake Watersheds: Stage One Report: Watershed Characterization and Water Quality Analysis

 
 Volume/Number:  2006 March 13 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  03 13 2006 
 Agency ID:   
 ISL ID:  000000043256   Original UID: 22766 FIRST WORD: TMDL 
Page: Prev  1 2 3 4  Next