Illinois State Library

Electronic Documents of Illinois


Browse by TITLE

0  1  2  3  4  5  6  7  8  9  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z 
Search:
I* in FirstWord [X]
rss icon RSS
Results:  10866 Items
Sorted by:  
Page: Prev  ...  101 102 103 104 105   ...  Next
XMLRecordID
(15)
000000000004 (1)
000000000007 (1)
000000000014 (1)
000000000015 (1)
DateCreated
2081:

Title:  

IL 2 between Oregon and Byron

 
 Volume/Number:  2011 November 15 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that IL 2 between Oregon and Byron will be open to traffic by late afternoon on Friday, November 18, 2011. The roadway has been closed since April 5, 2011 when work began to reconstruct the 7.2 mile section of highway. 
 Date Created:  11 15 2011 
 Agency ID:  Nr70-11 
 ISL ID:  000000038870   Original UID: 19441 FIRST WORD: IL 
2082:

Title:  

IL 251 and Harlem Road in Machesney Park

 
 Volume/Number:  2011 November 15 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation, located in Dixon, announces that inlet repairs will take place at IL 251 and Harlem Road in Machesney Park. These repairs will begin on Thursday, November 17, 2011, at 8:00 AM and we anticipate the repairs being completed in one day. The traffic control will remain in place to protect the work area and will be pulled by Friday afternoon. There will be multiple lane closures; the most significant is the complete closure of the through lanes on the west leg of Harlem Road. Also, the intersection will be in red flash for the duration of the work. 
 Date Created:  11 14 2011 
 Agency ID:  nr-227 
 ISL ID:  000000038872   Original UID: 19443 FIRST WORD: IL 
2083:

Title:  

IL 116 at Marina Ln. in East Peoria Lane Closure

 
 Volume/Number:  2011 November 2 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that the westbound driving lane of IL 116 at Marina Ln. in East Peoria will be closed Friday, November 4th from 8:30 a.m. until approximately 1:00 p.m. 
 Date Created:  11 02 2011 
 Agency ID:   
 ISL ID:  000000038885   Original UID: 19458 FIRST WORD: IL 
2084:

Title:  

IL 6 and US 150 in Peoria County

 
 Volume/Number:  2011 October 13 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces the following work on IL 6 and US 150 in Peoria County: Friday, October 14th oResurfacing work on northbound IL 6, with traffic being staged on the ramp from northbound IL 6 to US 150; motorists should expect considerable delays and consider alternate routes during the morning hours while work is underway Monday, October 17th oThe ramps from northbound IL 6 to US 150 and from US 150 to northbound IL 6 will be closed from approximately 9:00 a.m. to 3:30 p.m. for paving Tuesday, October 18th oThe ramps from southbound IL 6 to US 150 and from US 150 to southbound IL 6 will be closed from approximately 8:30 a.m. to 3:30 p.m. for paving 
 Date Created:  10 13 2011 
 Agency ID:   
 ISL ID:  000000038890   Original UID: 19469 FIRST WORD: IL 
2085:

Title:  

IL 40 from Hickory Grove Rd. to Cedar Hills Dr. in Peoria County

 
 Volume/Number:  2011 October 3 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that resurfacing work on IL 40 from Hickory Grove Rd. to Cedar Hills Dr. in Peoria County will begin Wednesday, October 5th weather permitting. 
 Date Created:  10 03 2011 
 Agency ID:   
 ISL ID:  000000038892   Original UID: 19475 FIRST WORD: IL 
2086:

Title:  

IL Route 1 at Gordon Junction

 
 Volume/Number:  2011 September 27 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (District 7) is coordinating with the Indiana Railroad on a project to improve the railroad crossing on IL Route 1 in Gordon, which is located 3.5 miles east of Robinson. The project is tentatively scheduled for October 10rd thru 14th, 2011. 
 Date Created:  09 27 2011 
 Agency ID:   
 ISL ID:  000000038904   Original UID: 19477 FIRST WORD: IL 
2087:

Title:  

IL 160/Sycamore Street in Highland will be Closed Between Trestle Road and Boeser Road

 
 Volume/Number:  2011 November 29 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation today announced that IL 160/ Sycamore Street in Highland will be closed between Trestle Road and Boeser Road starting on Wednesday, November 30, 2011. Maintenance activities are anticipated to be completed by Monday, December 5, 2011, weather permitting. 
 Date Created:  11 29 2011 
 Agency ID:   
 ISL ID:  000000038909   Original UID: 19483 FIRST WORD: IL 
2088:

Title:  

IL Route 160 Over Branch Lake Creek in Clinton County

 
 Volume/Number:  2011 November 17 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that beginning Monday, November 21, 2011, weather permitting, the structure carrying IL Route 160 over Branch Lake Creek located 2.2 miles south of Trenton will be reduced to one lane. Signing, traffic control devices and flaggers will be provided to aid motorists through the work zones during the initial stages of construction until the Temporary Traffic Signals are placed to direct the motorists. Please watch for stopped traffic and allow extra time when traveling through the work zone. This construction and lane reduction is necessary to remove and replace the existing structure. Work should be completed by September, 2012. The contractor on this project is Thiems Construction Company, Inc. of Edwardsville, IL. Stephen Putz is the Supervising Field Engineer for the Illinois Department of Transportation in this area. If you have any questions concerning this project, you may contact him at 618-346-3350. 
 Date Created:  11 17 2011 
 Agency ID:   
 ISL ID:  000000038916   Original UID: 19490 FIRST WORD: IL 
2089:

Title:  

IL 158 and I-64 in St Clair County

 
 Volume/Number:  2011 November 1 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation today announced that effective Monday, November 7, 2011, width restrictions will be encountered on the I-64 ramps to Illinois 158. Traffic will be guided through the work zone utilizing flaggers, traffic control devices and traffic control signing. Please use extreme caution while traveling through the work zone. These lane closures are necessary to repair the existing pavement. This work should be completed by Friday, November 11, 2011, weather permitting. The contractor on this project is Keeley and Sons Construction from East St. Louis, Illinois. Joseph G. Gasaway is the Supervising Field Engineer for the Illinois Department of Transportation in the area. If you have any questions concerning this project, you may contact him at 618/346-3354. 
 Date Created:  10 31 2011 
 Agency ID:   
 ISL ID:  000000038918   Original UID: 19492 FIRST WORD: IL 
2090:

Title:  

IL 149 RR Crossing in Desoto

 
 Volume/Number:  2012 January 24 
 Issuing Agency:   
 Description:  Omer Osman, Deputy Director and District 9 Engineer for the Illinois Department of Transportation announced today that a Canadian National/Illinois Central Railroad crew will make repairs to the Illinois Route 149 Railroad Crossing in Desoto, IL beginning Tuesday, January 31, 2012 at 7:30 a.m. The highway at the railroad crossing will remain closed until repairs are completed on the afternoon of Wednesday, February 1, 2012. 
 Date Created:  01 20 2012 
 Agency ID:   
 ISL ID:  000000039438   Original UID: 20004 FIRST WORD: IL 
2091:

Title:  

IL 13 over Unnamed Creek, 0.9 Miles Northwest of Marissa in St. Clair County

 
 Volume/Number:  2012 February 15 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation today announced that the eastbound and westbound lanes of IL 13 over Unnamed Creek, 0.9 miles northwest of Marissa in St. Clair County, will be intermittently restricted, during daytime hours only, from Tuesday, February 21 to Thursday, February 23, 2012, weather permitting. These lane closures are necessary for geotechnical investigations for proposed structure replacement. VeNiecy Pearman-Green is the Geotechnical Engineer for the Illinois Department of Transportation on this project. If you have any questions concerning this project, you may contact her at 618/346-3313. 
 Date Created:  02 15 2012 
 Agency ID:   
 ISL ID:  000000039990   Original UID: 20353 FIRST WORD: IL 
2092:

Title:  

IL Route 58 (Dempster St.) between Sherman Ave. and Sherman Place in Evanston

 
 Volume/Number:  2012 March 2 
 Issuing Agency:   
 Description:  IL 58 (Dempster St.) will be fully closed at the CTA viaduct between Sherman Ave and Sherman Place in the City of Evanston, Cook County. 
 Date Created:  03 02 2012 
 Agency ID:   
 ISL ID:  000000042694   Original UID: 22225 FIRST WORD: IL 
2093:

Title:  

IL Route 7 West of Route 171 in the Lockport, Will County

 
 Volume/Number:  2012 March 22 
 Issuing Agency:   
 Description:  CN Railroad Closure 
 Date Created:  03 22 2012 
 Agency ID:   
 ISL ID:  000000042702   Original UID: 22233 FIRST WORD: IL 
2094:

Title:  

IL 2 bridge over BNandSF Railroad, south edge of Oregon

 
 Volume/Number:  2012 March 6 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on the IL 2 bridge over the BNandSF Railroad at the south edge of Oregon will begin on Monday, March 12, 2012. Illinois Constructors is the contractor for the $3.9 million project to remove and replace the structure. 
 Date Created:  03 07 2012 
 Agency ID:   
 ISL ID:  000000042767   Original UID: 22297 FIRST WORD: IL 
2095:

Title:  

IL 94 west of Reynolds

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, IL 94 (190th Avenue West) will be closed west of Reynolds for one week beginning on Monday, April 9, 2012. The roadway will be closed for replacement of a culvert between 105th Street West and 119th Street West. Traffic will be detoured west on 190th Avenue West to County Highway G (140th Street West), north to IL 192 at Edgington, and then east on IL 192 to IL 94 at Taylor Ridge. 
 Date Created:  04 04 2012 
 Agency ID:  April 4 
 ISL ID:  000000042771   Original UID: 22300 FIRST WORD: IL 
2096:

Title:  

IL 192 between Edgington and Taylor Ridge

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on IL 192 between Edgington and Taylor Ridge will begin on Tuesday, April 17, 2012. McCarthy Improvement Company will be making improvements to the 2 mile section of IL 192 from 140th Street in Edgington to 105th Street. The $199,419 project is expected to be completed in approximately one week. 
 Date Created:  04 10 2012 
 Agency ID:  April 10 
 ISL ID:  000000042772   Original UID: 22302 FIRST WORD: IL 
2097:

Title:  

IL 26 south of US 30 in Lee Co.

 
 Volume/Number:  2011  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on IL 26 south of US 30 will begin on Monday, April 16, 2012. Brandt Construction Company is starting the $3.8 million project to replace three bridges. The three structures are the Green River bridge 6 miles south of US 30, the bridge over a drainage ditch just north of Green River, and the bridge just south of Amboy Road approximately 4 miles south of US 30. 
 Date Created:  04 10 2012 
 Agency ID:   
 ISL ID:  000000042773   Original UID: 22303 FIRST WORD: IL 
2098:

Title:  

IL 2 (Main St.) north of Rockford

 
 Volume/Number:  2012 April 23 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces the following update to the project to reconstruct IL 2 (North Main Street) north of Rockford. On Tuesday, May 1, 2012, Latham Road will be closed west of IL 2 for approximately three months. Latham Road traffic will be detoured around the construction closure on Rockton Road, Gleasman Road and Old River Road. 
 Date Created:  04 23 2012 
 Agency ID:   
 ISL ID:  000000042780   Original UID: 22310 FIRST WORD: IL 
2099:

Title:  

IL 251 between Samuelson Road and Blackhawk Rd and US 20 and Montague Rd South of Rockford

 
 Volume/Number:  2012 April 23 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on two projects south of Rockford will begin on Tuesday, May 1, 2012. William Charles Construction Company is the contractor for both projects that will be completed by mid-May. 
 Date Created:  04 23 2012 
 Agency ID:   
 ISL ID:  000000042781   Original UID: 22311 FIRST WORD: IL 
2100:

Title:  

IL 5 (John Deere Road) between 16th Street and 7th Street in Rock Island County

 
 Volume/Number:  2012 May 7 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation, located in Dixon, announces that weather permitting a lane closure will be installed on IL 5 (John Deere Road) between 16th Street and 7th Street in Rock Island County, Illinois. The lane closure will be in the westbound left and center lanes of IL 5 (John Deere Road) and all traffic will be asked to merge into the right lane. This closure will begin on Tuesday, May 8, 2012 at 8:00 AM and conclude by 9:00 AM on Wednesday, May 9, 2012. 
 Date Created:  05 07 2012 
 Agency ID:   
 ISL ID:  000000042783   Original UID: 22313 FIRST WORD: IL 
Page: Prev  ...  101 102 103 104 105   ...  Next