Illinois State Library

Electronic Documents of Illinois


Browse by RECORD ID

0  1  2  3  4  5  6  7  8  9 
Search:
04* in FirstRecordID [X]
rss icon RSS
Results:  9908 Items
Sorted by:  
Page: Prev  ...  256 257 258 259 260   ...  Next
XMLRecordID
000000040000 (1)
000000040001 (1)
000000040002 (1)
000000040003 (1)
000000040004 (1)
DateCreated
5101:

Title:  

Pavement Repairs, Lane Closures in Will, South Cook Counties

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that a total of 22 pavement patching projects at various locations in Will County and south Cook County are scheduled to begin, weather permitting, Tuesday, Aug. 21. 
 Date Created:  08 20 2012 
 Agency ID:   
 ISL ID:  000000045117   Original UID: 24550 FIRST WORD: Pavement 
5102:

Title:  

Illinois 43 Bridge Project in Tinley Park

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that the installation of a new bridge overlay on Illinois 43 (Harlem Avenue) over Midlothian Creek in Tinley Park is scheduled to begin, weather permitting, Monday, Aug. 20. 
 Date Created:  08 16 2012 
 Agency ID:   
 ISL ID:  000000045118   Original UID: 24551 FIRST WORD: Illinois 
5103:

Title:  

Illinois 50 Safety Improvements

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that a project to add several safety and pedestrian improvements to Illinois 50 (Cicero Avenue) from approximately 34th Street to Pershing Road through Chicago, Cicero and Stickney is scheduled to begin, weather permitting, on Monday, Aug. 20. 
 Date Created:  08 10 2012 
 Agency ID:   
 ISL ID:  000000045119   Original UID: 24552 FIRST WORD: Illinois 
5104:

Title:  

Interstate 55 Lane Closures at Central Avenue

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that overnight lane closures on Interstate 55 (Stevenson Expressway), including full closures of the expressway for several minutes at a time, are scheduled for Saturday, August 11. 
 Date Created:  08 10 2012 
 Agency ID:   
 ISL ID:  000000045120   Original UID: 24553 FIRST WORD: Interstate 
5105:

Title:  

Illinois 171 Resurfacing in Summit, Lyons

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that a pavement patching and resurfacing project on Illinois 171 (First Avenue) from Archer Road to 44th Place through Summit and Lyons is scheduled to begin, weather permitting, on Monday, Aug. 20. 
 Date Created:  08 10 2012 
 Agency ID:   
 ISL ID:  000000045121   Original UID: 24554 FIRST WORD: Illinois 
5106:

Title:  

IL Route 176 (Maple St.) at Canadian National Railroad closure in the Village of Mundelein

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  IL Route 176 (Maple St.) will be fully closed at the Canadian National Railroad in the Village of Mundelein, Lake County. Beginning on Friday, August 17, 2012 at 8:00 AM through Friday, August 24, 2012 at 6:00 PM for the repairs of the subject grade crossing. The posted detour route for eastbound traffic on IL Route 176 (Maple St.) is to proceed southbound on US Route 45 and eastbound on Hawley Street back to IL Route 176 (Maple St.). The posted detour route for westbound traffic on IL Route 176 (Maple St.) is to proceed south-west bound on Hawley Street and northbound on US Route 45 back to IL Route 176 (Maple St.). 
 Date Created:  08 10 2012 
 Agency ID:   
 ISL ID:  000000045122   Original UID: 24555 FIRST WORD: IL 
5107:

Title:  

Vermont Street Resurfacing in Blue Island, Chicago

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that a pavement patching and resurfacing project on Vermont Street from Western Avenue in Blue Island to 127th Street in Chicago will begin, weather permitting, Wednesday, Aug. 8. 
 Date Created:  08 06 2012 
 Agency ID:   
 ISL ID:  000000045123   Original UID: 24556 FIRST WORD: Vermont 
5108:

Title:  

Saturday Morning Lane Closures on Outbound I-290

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that pavement milling and patching repairs to outbound Interstate 290 (Eisenhower Expressway) will require lane closures, weather permitting, the morning of Saturday, Aug. 4. 
 Date Created:  08 02 2012 
 Agency ID:   
 ISL ID:  000000045124   Original UID: 24557 FIRST WORD: Saturday 
5109:

Title:  

I-74 lane restriction at the IL 5 (John Deere Road) overpass

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, I-74 will be restricted to one lane in each direction at the IL 5 (John Deere Road) overpass on Tuesday, September 4, 2012, from 9:00 a.m. to 2:00 p.m. The lane closures are necessary due to the construction work on the overhead bridges. Civil Constructors began repairs on structures on July 16th. The $1.1 million project is scheduled to be completed by mid-September. 
 Date Created:  08 30 2012 
 Agency ID:   
 ISL ID:  000000045125   Original UID: 24580 FIRST WORD: I 
5110:

Title:  

I-55 Bridge Inspections in Will County Aug. 7

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that routine inspections of the Interstate 55 truss bridges over the Des Plaines River near Channahon are scheduled, weather permitting, for Tuesday, August 7. 
 Date Created:  08 02 2012 
 Agency ID:   
 ISL ID:  000000045126   Original UID: 24558 FIRST WORD: I 
5111:

Title:  

Temporary Lane Closures in Lake County

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that the first two of nine pavement patching projects in Lake County are scheduled to begin, weather permitting, on Wednesday, Aug. 1. 
 Date Created:  06 30 2012 
 Agency ID:   
 ISL ID:  000000045127   Original UID: 24559 FIRST WORD: Temporary 
5112:

Title:  

Temporary Lane Closures in McHenry County

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that three pavement patching projects in McHenry County are scheduled to begin, weather permitting, on Wednesday, Aug. 1. 
 Date Created:  07 30 2012 
 Agency ID:   
 ISL ID:  000000045128   Original UID: 24560 FIRST WORD: Temporary 
5113:

Title:  

Illinois 50 Bridge Maintenance in Alsip

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that bridge joint reconstruction and other routine repairs to the Illinois 50 (Cicero Avenue) bridge over the CSX Railroad in Alsip are scheduled to begin, weather permitting, on Monday, Aug. 6. 
 Date Created:  07 27 2012 
 Agency ID:   
 ISL ID:  000000045129   Original UID: 24561 FIRST WORD: Illinois 
5114:

Title:  

Saturday Morning Lane Closures on I-55

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that pavement milling and patching repairs to Interstate 55 (Stevenson Expressway) will require lane closures, weather permitting, the morning of Saturday, July 28. 
 Date Created:  07 26 2012 
 Agency ID:   
 ISL ID:  000000045130   Original UID: 24562 FIRST WORD: Saturday 
5115:

Title:  

Temporary Lane Closures on Dan Ryan Saturday

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that routine maintenance on the southbound Dan Ryan Expressway (Interstate 90/94) will require a lane closure between Roosevelt Road and 26th Street, weather permitting, the morning of Saturday, July 28. 
 Date Created:  07 24 2012 
 Agency ID:   
 ISL ID:  000000045131   Original UID: 24563 FIRST WORD: Temporary 
5116:

Title:  

Sign Installation Requires Temporary I-80/294 Ramp Closure

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announced that the installation of new signs at the interchange between I-80 and I-294, in Hazel Crest, will require a ramp closure, weather permitting, the morning of Saturday, July 21. 
 Date Created:  07 19 2012 
 Agency ID:   
 ISL ID:  000000045132   Original UID: 24564 FIRST WORD: Sign 
5117:

Title:  

Ramp Closures at I-55, I-294 Saturday Morning

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announced that the installation of new signs at the interchange between Interstate 55 (Stevenson Expressway) and Interstate 294 (Tri-State Tollway) near Burr Ridge will require a ramp closure, weather permitting, the morning of Saturday, July 14. 
 Date Created:  07 12 2012 
 Agency ID:   
 ISL ID:  000000045133   Original UID: 24565 FIRST WORD: Ramp 
5118:

Title:  

Weekend Southbound I-57 Lane Closures Over I-294

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that the repaving of southbound Interstate 57 over Interstate 294 (Tri-State Tollway) will require temporary lane closures this weekend. 
 Date Created:  07 12 2012 
 Agency ID:   
 ISL ID:  000000045134   Original UID: 24566 FIRST WORD: Weekend 
5119:

Title:  

Interstate 80 Bridge Inspections in Joliet to Close Lanes

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that routine bridge inspections on Interstate 80 over the Des Plaines River in Joliet will require a daily lane closure for two days next week. 
 Date Created:  07 13 2012 
 Agency ID:   
 ISL ID:  000000045135   Original UID: 24567 FIRST WORD: Interstate 
5120:

Title:  

Bridge Deck Patching at Interstate 55 and U.S. 41

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  As part of the bridge substructure repair, the right two lanes (lanes 2 and 3) of northbound I-55 will be closed at King Drive, weather permitting, from 12:01 a.m. to 5 a.m. Thursday. The ramp from northbound I-55 to southbound Lake Shore Drive will need to be closed from 12:01 a.m. to 5 a.m. Thursday. A detour route will be posted directing traffic to northbound Lake Shore Drive and the 18th Street exit, and entrance ramps to access southbound Lake Shore Drive. The State Street entrance ramp to Northbound I-55 will need to be closed 12:01 a.m. to 5 a.m. A detour route will be posted directing traffic to 31st Street and Lake Shore Drive. 
 Date Created:  07 03 2012 
 Agency ID:   
 ISL ID:  000000045136   Original UID: 24568 FIRST WORD: Bridge 
Page: Prev  ...  256 257 258 259 260   ...  Next