Illinois State Library

Electronic Documents of Illinois


Browse by RECORD ID

0  1  2  3  4  5  6  7  8  9 
Search:
04* in FirstRecordID [X]
rss icon RSS
Results:  9908 Items
Sorted by:  
Page: Prev  ...  156 157 158 159 160   ...  Next
XMLRecordID
000000040000 (1)
000000040001 (1)
000000040002 (1)
000000040003 (1)
000000040004 (1)
DateCreated
3161:

Title:  

TMDL Development for the Crab Orchard Creek Watershed, Illinois: Stage Three Report Public Review Draft

 
 Volume/Number:  2008 February 28 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  02 28 2008 
 Agency ID:   
 ISL ID:  000000043169   Original UID: 22683 FIRST WORD: TMDL 
3162:

Title:  

Crab Orchard Creek Watershed TMDL Stage One Third Quarter Draft Report

 
 Volume/Number:  2006 June 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  06 07 2006 
 Agency ID:   
 ISL ID:  000000043170   Original UID: 22684 FIRST WORD: Crab 
3163:

Title:  

TMDL Development for the Crooked Creek Watershed, Illinois: Public Review Draft

 
 Volume/Number:  2008 January 24 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  01 24 2008 
 Agency ID:   
 ISL ID:  000000043171   Original UID: 22685 FIRST WORD: TMDL 
3164:

Title:  

Crooked Creek Watershed TMDL Implementation Plan: Draft Report

 
 Volume/Number:  2008 February 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  02 26 2008 
 Agency ID:   
 ISL ID:  000000043172   Original UID: 22686 FIRST WORD: Crooked 
3165:

Title:  

Crooked Creek Watershed TMDL Stage One Third Quarter Draft Report

 
 Volume/Number:  2006 May 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  05 29 2006 
 Agency ID:   
 ISL ID:  000000043173   Original UID: 22687 FIRST WORD: Crooked 
3166:

Title:  

Quarterly Report 1 (July-September 2001): West Branch DuPage River Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is the first quarterly report for the West Branch DuPage River Watershed Total Maximum Daily Load (TMDL) project. This quarterly report provides a brief description of what the progress to date on the project and which segments of the West Branch DuPage River are listed as impaired. 
 Date Created:  04 05 2002 
 Agency ID:   
 ISL ID:  000000043174   Original UID: 22688 FIRST WORD: Quarterly 
3167:

Title:  

Quarterly Report 2 (October-December 2001): West Branch DuPage River Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is the second quarterly report for the West Branch DuPage River Watershed Total Maximum Daily Load (TMDL) project. This quarterly report provides a brief description of project progress during the quarter and the proposed TMDL endpoints for each impairment. 
 Date Created:  04 05 2002 
 Agency ID:   
 ISL ID:  000000043175   Original UID: 22689 FIRST WORD: Quarterly 
3168:

Title:  

Quarterly Report 3 (January-March 2002): West Branch DuPage River Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is the third quarterly report for the West Branch DuPage River Watershed Total Maximum Daily Load (TMDL) project. This quarterly report provides a brief description of project progress during the quarter and the proposed TMDL endpoints for each impairment. 
 Date Created:  04 05 2002 
 Agency ID:   
 ISL ID:  000000043176   Original UID: 22690 FIRST WORD: Quarterly 
3169:

Title:  

Quarterly Report 4 (April-June 2002): West Branch DuPage River Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is the fourth quarterly report for the West Branch DuPage River Watershed Total Maximum Daily Load (TMDL) project. This report briefly describes project progress during the quarter and the proposed TMDL endpoints for each impairment. 
 Date Created:  07 15 2002 
 Agency ID:   
 ISL ID:  000000043177   Original UID: 22691 FIRST WORD: Quarterly 
3170:

Title:  

Quarterly Report Dutchman Creek Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is first in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Dutchman Creek Watershed. The Illinois Environmental Protection Agency (IEPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. IEPA plans to complete the TMDLs for this watershed within the next 14 months. This quarterly report provides a brief description of what a TMDL is, the waterbodies that are scheduled for TMDL development, the standards and targets the TMDLs will aim to meet, public participation opportunities, project progress, and the next steps of the process to complete. 
 Date Created:  04 30 2002 
 Agency ID:   
 ISL ID:  000000043178   Original UID: 22692 FIRST WORD: Quarterly 
3171:

Title:  

Quarterly Report 2: Dutchman Creek Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is second in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Dutchman Creek Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed. 
 Date Created:  04 30 2002 
 Agency ID:   
 ISL ID:  000000043179   Original UID: 22693 FIRST WORD: Quarterly 
3172:

Title:  

Quarterly Report 3: Dutchman Creek Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is third in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Dutchman Creek Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of progress during the months of December 2001 through February 2002. 
 Date Created:  04 30 2002 
 Agency ID:   
 ISL ID:  000000043180   Original UID: 22694 FIRST WORD: Quarterly 
3173:

Title:  

Quarterly Report 4: Dutchman Creek Watershed

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This is fourth in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Dutchman Creek Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser and McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next five months. This quarterly report provides a brief description of progress since the last quarterly report. 
 Date Created:  09 20 2002 
 Agency ID:   
 ISL ID:  000000043181   Original UID: 22695 FIRST WORD: Quarterly 
3174:

Title:  

Total Maximum Daily Load Development for Dutchman Creek Watershed

 
 Volume/Number:  2003 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  10 29 2003 
 Agency ID:   
 ISL ID:  000000043182   Original UID: 22696 FIRST WORD: Total 
3175:

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report

 
 Volume/Number:  2005 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043183   Original UID: 22697 FIRST WORD: Total 
3176:

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report

 
 Volume/Number:  2005 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043184   Original UID: 22697 FIRST WORD: Total 
3177:

Title:  

TMDL Development for Evergreen Lake: Quarterly Report #1

 
 Volume/Number:    
 Issuing Agency:   
 Description:  A Total Maximum Daily Load (TMDL) is being completed for Evergreen Lake. The TMDL development is in the Stage 1 phase, which consists of Watershed Characterization, Data Analysis, and Methodology Selection. Currently data is being collected for the watershed characterization and data analysis. This update provides an overview of data collected to date. 
 Date Created:  07 26 2004 
 Agency ID:   
 ISL ID:  000000043185   Original UID: 22699 FIRST WORD: TMDL 
3178:

Title:  

Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Draft TMDL

 
 Volume/Number:  2005 August 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  08 30 2005 
 Agency ID:   
 ISL ID:  000000043186   Original UID: 22700 FIRST WORD: Glenn 
3179:

Title:  

Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Final Stage 1 Progress Report

 
 Volume/Number:  2005 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 25 2005 
 Agency ID:   
 ISL ID:  000000043187   Original UID: 22701 FIRST WORD: Glenn 
3180:

Title:  

Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): ... Quarterly Progress Report [includes First, Second, and Third Quarterly Reports]

 
 Volume/Number:  2004 August {#1] and October [#2 and 3] 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  08 16 2004 
 Agency ID:   
 ISL ID:  000000043188   Original UID: 22702 FIRST WORD: Glenn 
Page: Prev  ...  156 157 158 159 160   ...  Next