Illinois State Library

Electronic Documents of Illinois


Browse by RECORD ID

0  1  2  3  4  5  6  7  8  9 
Search:
04* in FirstRecordID [X]
rss icon RSS
Results:  9908 Items
Sorted by:  
Page: Prev  ...  131 132 133 134 135   ...  Next
XMLRecordID
000000040000 (1)
000000040001 (1)
000000040002 (1)
000000040003 (1)
000000040004 (1)
DateCreated
2681:

Title:  

1500 Skokie Asbestos Site: Northbrook, Illinois

 
 Volume/Number:  2001  
 Issuing Agency:   
 Description:  After responding to a complaint on March 14, 2001, regarding asbestos removal work at an office building at 1500 Skokie Blvd., Northbrook, Illinois EPA inspected the site. The State of Illinois subsequently sealed the building from public access on March 14, 2001, due to an immediate health threat presented by uncontrolled asbestos contamination throughout the building. Consequently, tenants of the building have been unable to access their offices since that time. 
 Date Created:  05 31 2012 
 Agency ID:  Fact Sheet #2 
 ISL ID:  000000042689   Original UID: 22220 FIRST WORD: 1500 
2682:

Title:  

New Jersey Zinc/Mobil Chemical Superfund Site: Progress Report, DePue, Illinois

 
 Volume/Number:  2006 July 
 Issuing Agency:   
 Description:  This fact sheet is a project update about work accomplished at the New Jersey Zinc/Mobil Chemical Superfund site (Site) in the Village of DePue during the year 2005, and projected activities for 2006. Significant progress was made in several of the Operable Units (OUs), or areas of concern associated with the Site. In 1995, the State of Illinois and the potentially responsible parties (PRPs)1 entered into an Interim Consent Order to conduct Remedial Investigation/Feasibility Study activities, including investigation and remediation of the following Operable Units: OU1, South Ditch Sediment; OU2, Phosphogypsum Stack; OU3, Former Plant Site; OU4, Off-Site Soil; and OU5, DePue Lake and Floodplain. During 2005, the following activities were completed by the PRPs with oversight by the Illinois EPA. 
 Date Created:  05 31 2012 
 Agency ID:   
 ISL ID:  000000042690   Original UID: 22221 FIRST WORD: New 
2683:

Title:  

Emergency Operations Unit

 
 Volume/Number:  [2004]  
 Issuing Agency:   
 Description:  This brochure gives basic information on the purpose of Illinois EPA's Emergency Operations Unit. 
 Date Created:  10 18 2004 
 Agency ID:   
 ISL ID:  000000042691   Original UID: 22222 FIRST WORD: Emergency 
2684:

Title:  

Environmental Justice: Promoting Public Health and Protecting the Environment for All Citizens

 
 Volume/Number:  2008 March 
 Issuing Agency:   
 Description:  This brochure gives basic information on Environmental Justice in Illinois. 
 Date Created:  04 09 2008 
 Agency ID:   
 ISL ID:  000000042692   Original UID: 22223 FIRST WORD: Environmental 
2685:

Title:  

IDOT to Start IL Rt. 62 Widening Project In South Barrington

 
 Volume/Number:  2012 February 27 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) today announced that a reconstruction and widening project on IL Rt. 62/Algonquin Rd. in South Barrington is expected to start in the middle of this week, weather permitting. 
 Date Created:  02 27 2012 
 Agency ID:   
 ISL ID:  000000042693   Original UID: 22224 FIRST WORD: IDOT 
2686:

Title:  

IL Route 58 (Dempster St.) between Sherman Ave. and Sherman Place in Evanston

 
 Volume/Number:  2012 March 2 
 Issuing Agency:   
 Description:  IL 58 (Dempster St.) will be fully closed at the CTA viaduct between Sherman Ave and Sherman Place in the City of Evanston, Cook County. 
 Date Created:  03 02 2012 
 Agency ID:   
 ISL ID:  000000042694   Original UID: 22225 FIRST WORD: IL 
2687:

Title:  

IDOT: Ramp from McLean Blvd. to EB U.S. Rt. 20 Will be Closed Weekdays for Three Months

 
 Volume/Number:  2012 March 5 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) today announced that the ramp from McLean Blvd. to eastbound U.S. Rt. 20/Lake St. in Elgin will be closed weekdays from 9 a.m. to 5 p.m. while work proceeds on the reconstruction of the interchange. The ramp closure, starting on March 7, weather permitting, and lasting for approximately three months, is needed to allow for work on a retaining wall that is required to support a proposed temporary ramp. The ramp will remain open on weekends and on days when weather interferes with work on the temporary ramp. 
 Date Created:  03 05 2012 
 Agency ID:   
 ISL ID:  000000042695   Original UID: 22226 FIRST WORD: IDOT: 
2688:

Title:  

Interstate 90 (the Kennedy Expressway) from Montrose Ave. to IL 171 (Cumberland Ave)

 
 Volume/Number:  2012 March 8 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) today announced that, weather permitting, on Saturday, March 10, there will be routine inspection and minor repairs of the bridges over Interstate 90 (the Kennedy Expressway) from Montrose Ave. to IL 171 (Cumberland Ave) in Chicago. The work will require lane closures between 6 a.m. and 12 noon, weather permitting. Two lanes will be closed in the outbound direction in a moving operation. A minimum of one lane will remain open at all times. 
 Date Created:  03 08 2012 
 Agency ID:   
 ISL ID:  000000042696   Original UID: 22227 FIRST WORD: Interstate 
2689:

Title:  

IDOT: Bridge Work to Require Lane Closures On Kennedy/I-90 from Central to the Edens on Saturday AM

 
 Volume/Number:  2012 March 15 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) today announced that, weather permitting, on Saturday, March 17, there will be routine inspection of the bridges over Interstate 90 (the Kennedy Expressway) from Central Ave. to the junction at I-94/the Edens Expressway in Chicago. 
 Date Created:  03 15 2012 
 Agency ID:   
 ISL ID:  000000042697   Original UID: 22228 FIRST WORD: IDOT: 
2690:

Title:  

IDOT to Start IL Rt. 21/Milwaukee Ave. Widening Project in Libertyville 3/22

 
 Volume/Number:  2010 March 15 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) today announced that, weather permitting, on March 22nd, it will be starting a $23 million project to widen IL Rt. 21/Milwaukee Ave. in Libertyville. The two-year project is intended to eliminate a bottleneck and enhance safety on the two mile stretch of Milwaukee Ave. from north of IL Rt. 137 to IL Rt. 120. 
 Date Created:  03 15 2012 
 Agency ID:   
 ISL ID:  000000042698   Original UID: 22229 FIRST WORD: IDOT 
2691:

Title:  

Illinois 53 between Hoff and South Arsenal roads near Elwood and Wilmington

 
 Volume/Number:  2012 March 21 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that a project to resurface Illinois 53 between Hoff and South Arsenal roads near Elwood and Wilmington begins, weather permitting, April 2. 
 Date Created:  03 21 2012 
 Agency ID:   
 ISL ID:  000000042699   Original UID: 22230 FIRST WORD: Illinois 
2692:

Title:  

Illinois 47 Lane Closures in Huntley

 
 Volume/Number:  2012 March 22 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that the remaining work on the Illinois 47 widening project through Huntley is scheduled to begin Monday, March 26. 
 Date Created:  03 22 2012 
 Agency ID:   
 ISL ID:  000000042700   Original UID: 22231 FIRST WORD: Illinois 
2693:

Title:  

Sound Wall Installation on I-80

 
 Volume/Number:  2012 March 21 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that the construction of new sound walls along portions of the recently widened Interstate 80 in Will County started this week. 
 Date Created:  03 21 2012 
 Agency ID:   
 ISL ID:  000000042701   Original UID: 22232 FIRST WORD: Sound 
2694:

Title:  

IL Route 7 West of Route 171 in the Lockport, Will County

 
 Volume/Number:  2012 March 22 
 Issuing Agency:   
 Description:  CN Railroad Closure 
 Date Created:  03 22 2012 
 Agency ID:   
 ISL ID:  000000042702   Original UID: 22233 FIRST WORD: IL 
2695:

Title:  

Full Closures Scheduled on LaGrange Road in Orland Park

 
 Volume/Number:  2012 March 23 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that U.S. 45 (LaGrange Road) between 135th and 143rd streets in Orland Park will be closed overnight, weather permitting, for four consecutive nights starting March 30. The closures are required to install structural steel for the new Metra SouthWest Service Line bridge over U.S. 45. 
 Date Created:  03 23 2012 
 Agency ID:   
 ISL ID:  000000042703   Original UID: 22234 FIRST WORD: Full 
2696:

Title:  

Deerfield Road Bridge Replacement in Highland Park

 
 Volume/Number:  2012 March 27 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that a project to remove and replace the Deerfield Road bridge over East Skokie Ditch is scheduled to begin, weather permitting, on Monday, April 2. 
 Date Created:  03 27 2012 
 Agency ID:   
 ISL ID:  000000042704   Original UID: 22241 FIRST WORD: Deerfield 
2697:

Title:  

Interstate 290 Bridge Repairs

 
 Volume/Number:  2012 March 26 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that routine concrete repairs to three bridge and ramp substructures along Interstate 290 in Hillside, Elmhurst and Addison are scheduled to begin April 3. 
 Date Created:  03 26 2012 
 Agency ID:   
 ISL ID:  000000042705   Original UID: 22240 FIRST WORD: Interstate 
2698:

Title:  

Illinois Green Infrastructure Study: A Report to the Illinois Environmental Protection Agency on the Criteria in Section 15 of Public Act 96-0026, The Illinois Green Infrastructure for Clean Water Act of 2009 [draft final report]

 
 Volume/Number:  2010 May 28 
 Issuing Agency:   
 Description:  Green infrastructure practices, for purposes of this study, are urban stormwater management techniques that rely on natural systems to retain more stormwater on-site through infiltration, evapotranspiration and harvesting for reuse. Implementing green infrastructure practices helps attenuate nutrients and other pollutants and reduce runoff volumes and peak flows. Based on our review of peer-reviewed scientific reports and articles, we found that, on average, many of these practices are as effective as conventional on-site detention basins in reducing total suspended solids and total nitrogen being discharged to waterways and that they can also reduce runoff volumes and peak flows discharged to urban streams, reducing erosion, sedimentation and flood risks. 
 Date Created:  06 01 2010 
 Agency ID:   
 ISL ID:  000000042706   Original UID: 22242 FIRST WORD: Illinois 
2699:

Title:  

Illinois Department of Natural Resources (IDNR) Addendum on Green Infrastructure (draft as of 5/27/10)

 
 Volume/Number:  2010 May 27 
 Issuing Agency:   
 Description:  The IDNR submitted comments on the IEPAs initial draft of the Green Infrastructure Plan. The intent of those comments was to recognize the limits the legislative language placed on the IEPA effort and subsequently request the Agency allow the IDNR to present an expanded application of green infrastructure via this addendum. Despite the IDNR advocating an expanding application of green infrastructure, the IDNR recognizes the IEPAs storm water green infrastructure initiative as a commendable and critical first step. 
 Date Created:  05 28 2010 
 Agency ID:   
 ISL ID:  000000042707   Original UID: 22243 FIRST WORD: Illinois 
2700:

Title:  

Using Green Infrastructure to Manage Urban Stormwater Quality: A Review of Selected Practices and State Programs: A Draft Report to the Illinois Environmental Protection Agency

 
 Volume/Number:  2010 June 24 
 Issuing Agency:   
 Description:  Green infrastructure practices, for purposes of this study, are urban stormwater management techniques that rely on natural systems to retain more stormwater on-site through infiltration, evapotranspiration and harvesting for reuse. Implementing green infrastructure practices helps attenuate nutrients and other pollutants and reduce runoff volumes and peak flows. Based on our review of peer-reviewed scientific reports and articles, we found that, on average, many of these practices are as effective as conventional on-site detention basins in reducing total suspended solids and total nitrogen being discharged to waterways and that they can also reduce runoff volumes and peak flows discharged to urban streams, reducing erosion, sedimentation and flood risks. 
 Date Created:  06 30 2010 
 Agency ID:   
 ISL ID:  000000042708   Original UID: 22244 FIRST WORD: Using 
Page: Prev  ...  131 132 133 134 135   ...  Next