Illinois State Library

Electronic Documents of Illinois


Search results for

Search:
04* in FirstRecordID [X]
Illinois Environmental Protection Agency, Bureau of Water in Organization [X]
rss icon RSS
Results:  463 Items
Sorted by:  
Page: Prev  ...  6 7 8 9 10   ...  Next
SiteTitle
2001 305(b) Summary Report (1999 data) Inland Lakes (1)
2008 Final Federal CAFO Rule Frequently Asked Questions (1)
2008 Groundwater Protection Policy Forum: Groundwater Degradation and Sustainability, Pere Marquette, Peoria, IL, September 24th, 2008 (1)
Altamont New Reservoir TMDL Report (1)
Appendices to Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report (1)
Aquatic Exotics (1)
Aquatic Plant Management Options (1)
Arsenic in Illinois Groundwater (1)
Artificial Structures for Fish Cover (1)
Ashland New Lake Watersheds TMDL Stage Three Draft Report (1)
Ashland New Reservoir Watershed TMDL Stage One Draft Report (1)
Assessment of Total Chromium in Illinois Community Water Supplies (1)
Baseline Loadings of Nitrogen, Phosphorus, and Sediments from Illinois Watersheds (1)
Bay Creek Watershed TMDL Report (1)
Bay Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Bay Creek Watershed TMDL Stage Three Report (1)
Beaucoup Creek TMDL Report (1)
Beavers and Muskrats (1)
Big Muddy River TMDL Report (1)
Bonnie Creek TMDL Report (1)
Cahokia Canal Watershed TMDL Report (1)
Cahokia Canal/Horseshoe Lake Watershed TMDL: Stage One [Third Quarter Draft Report] (1)
Cahokia Canal/Horseshoe Lake Watershed Total Maximum daily Load Stage Three Report (1)
Cahokia Creek/Holiday Shores Lake Watershed TMDL: Stage One Third Quarter Draft Report (1)
Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report (1)
Canada Geese and Your Lake (1)
Canton Lake TMDL Development Stage 1 Report: Final (1)
Capacity Development Strategy for Existing Public Water Supplies, July 2000 (1)
Casey Fork TMDL Report (1)
Cedar Creek TMDL Report (1)
Cedar Creek Watershed TMDL Report (1)
Cedar Creek/Cedar Lake TMDL Implementation Plan: Public Review Draft Report (2)
Cedar Creek/Cedar Lake Watershed TMDL Stage One Third Quarter Draft Report (1)
Charleston Side Channel Reservoir Restoration Plan: Clean Lake Program Phase 1 Diagnostic Feasibility Study (1)
Charleston Side Channel Reservoir TMDL: Progress Report #1 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #2 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #3 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #4 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #5 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #6 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #7 (1)
Charleston Side Channel Reservoir TMDL: Progress Report ... (1)
Charleston Side Channel Reservoir Total Maximum Daily Load Report: Coles County, Illinois (1)
Charleston Side-Channel Reservoir Sedimentation Basin Project Final Report (1)
Chicago Botanic Garden Lakes: Illinois Clean Lakes Program Phase 2 Final Report (1)
Chloride Usage Education and Reduction Program Study: Final Report (1)
Chromium-6 Strategic Plan (1)
Clean Water Action Plan: Restoring and Protecting America's Waters: Unified Watershed Assessment and Watershed Restoration Priorities for Illinois (1)
Common Lake Water Quality Parameters (1)
Condition of Illinois Water Resources (2)
Consumer Confidence Report Guidance Manual (1)
Countryside Lake Water Quality Monitoring Program: Final Report (1)
Crab Orchard Creek Watershed TMDL Implementation Plan: Public Review Draft Report (1)
Crab Orchard Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Crab Orchard Watershed TMDL Report (1)
Crooked Creek Watershed TMDL Implementation Plan: Draft Report (1)
Crooked Creek Watershed TMDL Report (1)
Crooked Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Des Plaines River/Higgins Creek Watershed TMDL Report: Draft (1)
Des Plaines River/Higgins Creek Watershed TMDL Stage 1 Report (1)
Determining Your Lake's Watershed (1)
Digester/Over the Spillway (29)
DuPage River/Salt Creek Watershed TMDL Stage 1 Report (1)
DuPage River/Salt Creek Watershed TMDL Stage 1 Report and Stage 2 TMDL - Sediment Oxygen Demand Monitoring (1)
Dutchman Creek TMDL Report (1)
East Fork Kaskaskia River TMDL Report (1)
East Fork Kaskaskia Watershed TMDL River (1)
East Fork LaMoine River Watershed TMDL Report (1)
East Fork LaMoine River/Spring Lake Watershed TMDL Stage One Third Quarter Draft Report (1)
Evergreen Lake Watershed Plan (1)
Facility Planning Area Research: Final Program Evaluation (2)
Fecal Coliform TMDL Development for the Little Vermilion River, Illinois: Public Review Draft Report (2)
Fertilizers and Pesticides: Options for Lawn and Garden Use (1)
Final Approved Stage Three Report TMDLs for Target Watersheds: Project Watershed HUC 0714020205 (East Fork Kaskaskia River) Stream Segments IL_OK-01 and IL-OK-02 (1)
First Quarterly Progress Report: Project Watershed HUC 0714020205 (East Fork Kaskaskia River) (1)
Framework for a Basinwide Planning and Protection Pilot (1)
Georgetown Lake TMDL Implementation Plan: Public Review Draft Report (1)
Glenn Shoals-Hillsboro Watershed TMDL Report (1)
Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): ... Quarterly Progress Report [includes First, Second, and Third Quarterly Reports] (1)
Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Draft TMDL (1)
Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Final Stage 1 Progress Report (1)
Governor Bond Lake Greenville, Illinois Total Maximum Daily Loads (1)
Governor Bond TMDL Report (1)
Greenville Lake and Coffeen Lake TMDL: Draft Stage 1 Report: Watershed Characterization, Data Analysis, And Methodology selection (1)
Greenville Old Lake and Coffeen Lake Watersheds (1)
Guidance Document for Groundwater Protection Needs Assessments (1)
Guidance for Developing Watershed Action Plans in Illinois (1)
Highland Silver Lake Watershed (ROZA): ... Quarterly Progress Report [includes First, Second and Third Quarterly Reports] (1)
Highland Silver Lake Watershed (ROZA): Draft TMDL (1)
Highland Silver Lake Watershed (ROZA): Final Stage 1 Progress Report (1)
Highland Silver Lake Watershed TMDL Report (1)
Hobson Creek Corridor Restoration Project, Phase 1: Tributary 6 to the East Branch DuPage River: Section 319 Project Report (1)
Hobson Creek Corridor Restoration Project, Phase 2: Tributary 6 to the East Branch DuPage River: Section 319 Project Report (1)
Hobson Creek Corridor Restoration Project, Phase 3: Tributary 6 to the East Branch DuPage River: Section 319 Project Report (1)
Hodges Creek TMDL [Stage 3 Draft] (1)
Hodges Creek Watershed Final Stage 1 Progress Report (1)
Hodges Creek Watershed: Otter Lake (RDF), Palmyra-Modesto Lake (RDZP), Hettick Lake (SDZF): Draft TMDL (1)
Home and Yard (1)
Illinois 2002 Section 303(d) List (1)
Illinois Annual Report on the Efficacy of Capacity Development (1)
Illinois Annual Report on the Efficacy of Capacity Development, October 1, 2010 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2005 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2006 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2007 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2009 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2012 (1)
Illinois Benthic Macroinvertebrate Collection Method Comparison and Stream Condition Index Revision [2004: rev 2007] (1)
Illinois Clean Lakes Program (1)
Illinois EPA Ambient Groundwater Monitoring Network Factsheet (1)
Illinois EPA Clean Lakes Program: Clean Lakes Study Review and Implementation Report for Lake Hillsboro, Montgomery County, Illinois (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Cedar Lake and Carbondale Reservoir, Carbondale, IL (Final Report - January 2009) (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Highland Silver Lake, Highland, IL: Final Report (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Kinkaid Lake, Jackson County, IL (Final Report - September 2006) (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Lake Vermilion, Vermilion County, IL: final draft submittal (1)
Illinois EPA Clean Lakes Program: Phase I Diagnostic / Feasibility Study of Campus Lake, Southern Illinois University, Carbondale, Jackson County, Illinois (1)
Illinois EPA Livestock Program 1999 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2000 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2001 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2002 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2003 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2004 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2005 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2006 livestock facility investigation annual report (2)
Illinois EPA Livestock Program 2007 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2008 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2010 Livestock Facility Investigation Annual Report (1)
Illinois EPA Livestock Program 2011 Livestock Facility Investigation Annual Report (1)
Illinois EPA's Ash Impoundment Strategy Progress Report (4)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Glenn Shoals Lake, City of Hillsboro, Montgomery County, Illinois (1)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Governor Bond Lake, City of Greenville, Bond County, Illinois (1)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Staunton Lake, City of Staunton, Macoupin County, Illinois (1)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic and Feasibility Study, Patriots Park Lake, Kingsbury Park District, Bond County, Illinois (1)
Illinois Groundwater Protection Program: A Biennial Report (2)
Illinois Groundwater Protection Program: Biennial Comprehensive status and self-assessment report (1)
Illinois Groundwater Protection Program: Biennial comprehensive status and self-assessment report, Executive Summary (1)
Illinois Groundwater Protection Program: Biennial policy report (1)
Illinois Groundwater Protection Program: volume 1: Biennial Policy Report (1)
Illinois Groundwater Protection Program: volume II: biennial program report (1)
Illinois Groundwater Protection Program: volume III: biennial technical appendices report (1)
Illinois Lakeshore Birds (1)
Illinois Public Water Supply Emergency Procedures Quick Reference Guide (1)
Illinois River (Peoria Area) TMDL and LRS Development: Watershed Characterization and Source Assessment Report (Stage 1) [review draft] (2)
Illinois Volunteer Lake Monitoring Program (VLMP) (1)
Illinois Volunteer Lake Monitoring Program Newsletter (8)
Illinois Volunteer Lake Monitoring Program Newsletter: (1)
Illinois Water Pollution Control Loan Program,Annual Report, FY ... (1)
Illinois Water Pollution Control Loan Program,Annual Report, [FY 2007] (1)
Illinois Water Quality Report (2)
Illinois' Nonpoint Source Management Program (2)
Kickapoo Creek Project - Phase I: IEPA 319 Grant: Final Report (1)
Kinkaid Lake TMDL Best Management Practices Implementation: Project Evaluation and Final Report (1)
Lake Beat (2)
Lake Bloomington TMDL: Draft Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology Selection (1)
Lake Bloomington TMDL: Final Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology Selection (1)
Lake Bloomington Watershed Plan (1)
Lake Bloomington Watershed TMDL Implementation Plan: Public Review Draft (1)
Lake Bloomington Watershed TMDL Report (1)
Lake Bloomington Watershed TMDL Stage 3 Public Draft Report (1)
Lake Dredging (1)
Lake Education Assistance Program (LEAP) (1)
Lake Glenn Shoals/Hillsboro Old Lake Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
Lake Oakland TMDL Implementation Plan: Public Review Draft Report (2)
Lake Oakland Watershed TMDL Report (1)
Lake Stratification and Mixing (1)
Little Muddy River TMDL Report (2)
Little Vermilion River Fecal Coliform TMDL Implementation Plan: Public Review Draft Report (1)
Little Wabash II Watershed TMDL Report (1)
Little Wabash River I Watershed TMDL Implementation Plan: Public Review Draft Report (1)
Little Wabash River II Watershed TMDL Implementation Plan: Public Review Draft (1)
Little Wabash River TMDL: Stage 1 Public Draft Report (1)
Little Wabash River Watershed TMDL Stage One Third Quarter Draft Report (1)
Little Wabash River Watershed: Stage 2 Data Report (2)
Little Wabash Watershed: Final Stage 1 Progress Report (1)
Load Reduction Strategy and TMDL Draft: Indian Creek, Dago Slough and Prairie Creek (1)
Lower Kaskaskia River Watershed TMDL Stage One: Final Report (2)
Lyman Woods Streambank Stabilization PSA 2, Phases 1 and 2: Tributary to the East Branch DuPage River: Section 319 Project Report (1)
Macoupin Creek Watershed Draft TMDL (1)
Macoupin Creek Watershed TMDL Report (1)
Maple Lake Rehabilitation and Protection Program: Phase 2 Implementation Project Report [at head of title: Illinois Clean Lakes Program] (1)
Mary's River/North Fork Cox Creek TMDL Implementation Plan: Public Review Draft Report (1)
Mary's River/North Fork Cox Creek Watershed TMDL Report (1)
Mary's River/North Fork Cox Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Mauvaise Terre Creek Watershed Final Approved TMDL (1)
Mauvaise Terre Creek Watershed TMDL Report (2)
Mauvaise Terre Creek Watershed TMDL: January 2011 Revision (1)
Mauvaise Terre Creek Watershed: Final Stage 1 Progress Report (1)
Maximum Setback Zone Workbook (1)
McCullom Lake Evaluation Report (1)
Methyl Tertiary Butyl Ether (MTBE) in Illinois (1)
Middle Fork Saline River Watershed TMDL Stage One: Final Report (2)
Middle Fork Saline River Watershed TMDL Stage Three Draft Report (1)
Middle Illinois River Total Maximum Daily Load and Load Reduction Strategies: Draft (1)
Milfoil Weevil (1)
Monitoring Lake Quality (1)
Mt. Olive New Lake, Mt. Olive Old Lake and Staunton Lake Watersheds TMDL Report (1)
North Fork Kaskaskia River Watershed Final Approved TMDL (1)
North Fork Kaskaskia River Watershed TMDL Report (1)
North Fork Kaskaskia River Watershed: ... Quarterly Progress Report [includes First, Second and Third Quarters] (1)
North Fork Mauvaise Terre Creek Watershed Draft Stage 3 Report (1)
North Fork Vermilion River Watershed TMDL Implementation Plan: Public Review Draft Report (2)
North Fork Vermilion River and Lake Vermilion TMDL Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology selection (2)
North Fork Vermilion River and Lake Vermilion TMDL: Draft Stage 3 Report (1)
Other Coal Ash Sites (1)
Otter Lake Shoreline Erosion Control Project (1)
Part 2: Lake and Watershed Management Plan, Carlinville, Macoupin County, Illinois (1)
Phase I Diagnostic/Feasibility Study: Lake Paradise, Coles County, Illinois (1)
Phase II Implementation Report for Campus Lake, Jackson County, Illinois (1)
Phosphorus: A Summary of Information Regarding Lake Water Quality (1)
Prairie Creek Watershed TMDL Report (1)
Pressure-Treated Wood (1)
Primer Regarding Certain Provisions of the Illinois Groundwater Protection Act (1)
Public Water Supply Loan Program (PWSLP) (1)
Public Water Supply Loan Program Annual Report, FY ... . (1)
Public Water Supply Loan Program Annual Report, [FY 2007] (1)
Quality Assurance and Field Methods Manual (1)
Quarterly Report 1 (July-September 2001): West Branch DuPage River Watershed (1)
Quarterly Report 1: Beaucoup Creek Watershed (1)
Quarterly Report 1: Big Muddy River #1 Watershed (1)
Quarterly Report 1: Big Muddy River #2 Watershed (1)
Quarterly Report 1: Bonnie Creek Watershed (1)
Quarterly Report 1: Casey Fork Watershed (1)
Quarterly Report 1: Little Muddy River Watershed (1)
Quarterly Report 1: Little Wabash River Watershed (1)
Quarterly Report 1: Vandalia Lake Watershed (1)
Quarterly Report 2 (October-December 2001): West Branch DuPage River Watershed (1)
Quarterly Report 2: Beaucoup Creek Watershed (1)
Quarterly Report 2: Big Muddy River #1 Watershed (1)
Quarterly Report 2: Big Muddy River #2 Watershed (1)
Quarterly Report 2: Bonnie Creek Watershed (1)
Quarterly Report 2: Casey Fork Watershed (1)
Quarterly Report 2: Dutchman Creek Watershed (1)
Quarterly Report 2: Little Muddy River Watershed (1)
Quarterly Report 2: Little Wabash River Watershed (1)
Quarterly Report 2: Vandalia Lake Watershed (1)
Quarterly Report 3 (January-March 2002): West Branch DuPage River Watershed (1)
Quarterly Report 3: Beaucoup Creek Watershed (1)
Quarterly Report 3: Big Muddy River #1 Watershed (1)
Quarterly Report 3: Big Muddy River #2 Watershed (1)
Quarterly Report 3: Bonnie Creek Watershed (1)
Quarterly Report 3: Casey Fork Watershed (1)
Quarterly Report 3: Dutchman Creek Watershed (1)
Quarterly Report 3: Little Muddy River Watershed (1)
Quarterly Report 3: Little Wabash River Watershed (1)
Quarterly Report 3: Vandalia Lake Watershed (1)
Quarterly Report 4 (April-June 2002): West Branch DuPage River Watershed (1)
Quarterly Report 4: Beaucoup Creek Watershed (1)
Quarterly Report 4: Big Muddy River #1 Watershed (1)
Quarterly Report 4: Big Muddy River #2 Watershed (1)
Quarterly Report 4: Bonnie Creek Watershed (1)
Quarterly Report 4: Casey Fork Watershed (1)
Quarterly Report 4: Dutchman Creek Watershed (1)
Quarterly Report 4: Little Muddy River Watershed (1)
Quarterly Report 4: Little Wabash River Watershed (1)
Quarterly Report 4: Vandalia Lake Watershed (1)
Quarterly Report Dutchman Creek Watershed (2)
Quarterly Report: Beaucoup Creek Watershed (1)
Quarterly Report: Big Muddy River #1 Watershed (1)
Quarterly Report: Big Muddy River #2 Watershed (1)
Quarterly Report: Bonnie Creek Watershed (1)
Quarterly Report: Casey Fork Watershed (1)
Quarterly Report: Little Muddy River Watershed (1)
Quarterly Report: Little Wabash River Watershed (1)
Quarterly Report: Vandalia Lake Watershed (1)
Quarterly Report: West Branch DuPage River Watershed (1)
Rayse Creek (ILNK01) TMDL and Implementation Plan (1)
Rayse Creek Watershed Management Plan (1)
Regional Fecal Coliform TMDL on Salt Creek of Sangamon River and Lower Sangamon River Watersheds: Stage 1 Report: Watershed Characterization and Water Quality Analysis (1)
Regional Fecal Coliform TMDL on Salt Creek of Sangamon River and Lower Sangamon River Watersheds: Stage 3 Final Report (1)
Report to Governor: Capacity Development Program, 2002 (1)
Report to Governor: Capacity Development Program: September 30, 2005 (1)
Reporting Requirements for Livestock Waste Releases in Illinois (1)
Restoring Illinois Water Quality with TMDLs (1)
Rock River Basin Assessment: An Overview of the Rock River Watersheds in Illinois (1)
Salt Fork Vermilion River Watershed TMDL Report (1)
Sample Collector's Handbook (1)
Sangamon River/Lake Decatur Watershed TMDL Report (1)
Sangamon River/Lake Decatur Watershed TMDL Stage One Third Quarter Draft Report (1)
Sediment Classification for Illinois Inland Lakes: 1996 Update (1)
Septic Systems (1)
Shoal Creek Watershed TMDL Implementation Plan: Public Review Draft Report (2)
Shoal Creek Watershed TMDL Report (1)
Shoal Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Shoreline Buffer Strips (1)
Shoreline Stabilization: Bioengineering Alternatives (1)
Skillet Fork Watershed TMDL Report (1)
Skillet Fork Watershed TMDL [Stage 3] (1)
Skillet Fork Watershed: Final Stage 1 Progress Report (1)
South Fork Saline - Lake Egypt Watershed TMDL Report (1)
South Fork Saline River/Lake of Egypt Implementation Plan: Draft Report (1)
South Fork Saline River/Lake of Egypt Watershed TMDL Stage One Third Quarter Draft Report (1)
South Fork Sangamon River/Lake Taylorville Watershed TMDL Report (1)
Spring Lake Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
Stage 2 - Water Quality Sampling Report for TMDLs in North Fork Vermilion River, Salt Fork Vermilion River, Sugar Creek, and Walnut Point Lake: Final Report (1)
Stage 2 Data Report: Final Report (1)
State of Illinois Public Water Supply Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan (1)
State of Illinois Section 319 - Biannual Report (8)
State of Illinois Section 319 - Biannual Report: March 2003 (1)
State of Illinois Section 319 - Biannual Report: March 2006 (2)
State of Illinois Section 319 - Biannual Report: March 2007 (1)
State of Illinois Section 319 - Biannual Report: March 2009 (1)
State of Illinois Section 319 - Biannual Report: March 2010 (1)
State of Illinois Section 319 - Biannual Report: September 2001 (2)
State of Illinois Section 319 - Biannual Report: September 2002 (1)
State of Illinois Section 319 - Biannual Report: September 2004 (1)
State of Illinois Section 319 - Biannual Report: September 2005 (2)
State of Illinois Section 319 Biannual Report (1)
State of Illinois Section 319 Biannual Report: March 2012 (1)
State of Illinois Water Pollution Control Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan (1)
Stormwater Detention Ponds (1)
Stream Dissolved Oxygen Improvement Feasibility Study for Salt Creek: Final Report (1)
Stream Dissolved Oxygen Improvement Feasibility Study for the East Branch of the DuPage River: Final Report (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Pilot (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Calendar Years 2007-2008 (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Calendar Years 2009-2010 (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Section 319-Project 0404, Calendar Year ... (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Section 319-Project 0404, Calendar Year 2003-2006 (1)
Sugar Creek Watershed TMDL Stage One: Final Report (1)
Surface Discharging Private Sewage Disposal Systems (Commonly Referred to as Septic Systems) and Their Effects on Communities in Illinois (1)
TMDL Development for Evergreen Lake: Quarterly Report (1)
TMDL Development for Evergreen Lake: Quarterly Report #1 (1)
TMDL Development for Homer Lake in the Salt Fork Vermilion River Watershed, Illinois: Stage Three Report: TMDL Development (1)
TMDL Development for Lake Michigan Beaches (1)
TMDL Development for Ohio River Watershed (1)
TMDL Development for the Cedar Creek/Cedar Lake Watershed, Illinois: Draft Report for IEPA Review (1)
TMDL Development for the Crab Orchard Creek Watershed, Illinois: Stage Three Report Public Review Draft (1)
TMDL Development for the Crooked Creek Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Final Report: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Public Review Draft Report: Stage Three Report: Lake Oakland TMDL Development (1)
TMDL Development for the Little Vermilion River Watershed: Final Report (2)
TMDL Development for the Little Wabash River Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the Little Wabash River Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Mt. Olive New Lake, Mt. Olive Old Lake, and Staunton Lake Watersheds: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Salt Fork Vermilion River Watershed: Stage One Report: Watershed Characterization and Water Quality Analysis (1)
TMDL Development for the Shoal Creek Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the South Fork Saline River/Lake of Egypt Watershed, Illinois: Public Review Draft Report (1)
TMDL and LRS Development for Middle Illinois River Watershed (1)
Tampier Lake/Saganashkee Slough Watersheds Stage One TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds Stage Three TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds TMDL Report (1)
The Condition of Illinois Water Resources (1)
Thorn Creek Watershed Based Plan (1)
Thorn Creek Watershed TMDL Stage 1 Report (1)
Total Maximum Daily Load Development for Altamont New Reservoir Watershed (1)
Total Maximum Daily Load Development for Beaucoup Creek Watershed (1)
Total Maximum Daily Load Development for Big Muddy River #1 Watershed (1)
Total Maximum Daily Load Development for Bonnie Creek Watershed (1)
Total Maximum Daily Load Development for Casey Fork Watershed (1)
Total Maximum Daily Load Development for Dutchman Creek Watershed (1)
Total Maximum Daily Load Development for Fox River (2)
Total Maximum Daily Load Development for Little Muddy River Watershed: Draft Final Report (1)
Total Maximum Daily Load Development for Vandalia Lake Watershed: Draft Final Report (1)
Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report (2)
Total Maximum Daily Load Evergreen Lake Watershed: Stage Three Draft Report (1)
Total Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final (1)
Total Maximum Daily Loads for Salt Creek, Illinois: Final Report (1)
Total Maximum Daily Loads for West Branch DuPage River, Illinois (2)
Total Maximum Daily Loads for the East Branch of the DuPage River, Illinois (1)
Triennial Capacity Development Report (1)
Triennial Capacity Development Report, 2011 (1)
Triennial Capacity Development Report: Safe Drinking Water: Leveraging Resources and Planning for the Future, 2008 (1)
Up-dating the LaMoine River Watershed Implementation Plan (1)
Upper Fox River/Chain O' Lakes Watershed TMDL Final Stage 1 Report (1)
Upper Fox River/Flint Creek Watershed TMDL Final Stage 1 Report (1)
Upper North Branch Chicago River Watershed TMDL Stage 1 Report (1)
Utilizing Exception Criteria to Avoid Boil Orders after Pressure Loss (1)
Vandalia Lake TMDL Report (1)
Vermilion River Watershed (IL Basin) TMDL Report (1)
Vermilion River Watershed (Illinois Basin) TMDL for Nitrates and Bacteria: Stage 1 Report (1)
Villa Park Police Station Urban BMP Demonstration Project: A Project to Demonstrate Integration of Green Roof, Permeable Paving, and Bioswale Urban Runoff Systems (1)
Wabash River Nutrient and Pathogen TMDL Development: Final Report (1)
Wabash River Watershed TMDL Report (1)
Walnut Point Lake Watershed TMDL Report (1)
Walnut Point Lake Watershed Total Maximum Daily Load Stage Three Report (1)
Water Monitoring Strategy (1)
Water Pollution Control Loan Program (WPCLP) (1)
Water Pollution Control Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan (1)
Waterborne Pathogens (1)
Watershed Implementation Plan for Lake Vermilion and the North Fork Vermilion River, Vermilion County, Illinois (1)
Watershed Plan and Phase 1 Diagnostic/Feasibility Study of Lake Carlinville, Macoupin County, Illinois (1)
Where to Go for Lake Information (1)
Zebra Mussels (1)
Organization
Illinois Environmental Protection Agency, Bureau of Water[X]
XMLRecordID
000000040034 (1)
000000040039 (1)
000000040040 (1)
000000040041 (1)
000000040044 (1)
DateCreated
101:

Title:  

Vermilion River Watershed (IL Basin) TMDL Report

 
 Volume/Number:  2009 July 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  07 22 2009 
 Agency ID:   
 ISL ID:  000000040764   Original UID: 20937 FIRST WORD: Vermilion 
102:

Title:  

Vandalia Lake TMDL Report

 
 Volume/Number:  2004 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  03 03 2005 
 Agency ID:  IEPA/BOW/03-012 
 ISL ID:  000000040765   Original UID: 20936 FIRST WORD: Vandalia 
103:

Title:  

Wabash River Watershed TMDL Report

 
 Volume/Number:  2006 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  09 18 2006 
 Agency ID:  IEPA/BOW/07-010 
 ISL ID:  000000040767   Original UID: 20938 FIRST WORD: Wabash 
104:

Title:  

Illinois Water Quality Report

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This report satisfies the requirements of the Clean Water Act, Section 305 b . The quality of the state's surface and groundwater resources is reported. Assessments are based on biological, water, sediment, physical-habitat, and fish-tissue information. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000041003   Original UID: NA for serial records FIRST WORD: Illinois 
105:

Title:  

Condition of Illinois Water Resources

 
 Volume/Number:    
 Issuing Agency:   
 Description:  305(b) reports satisfy the requirements of the Clean Water Act, Section 305 b . The quality of the state's surface and groundwater resources is reported. Assessments are based on biological, water, sediment, physical-habitat, and fish-tissue information. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000041004   Original UID: NA for serial records FIRST WORD: Condition 
106:

Title:  

Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Kinkaid Lake, Jackson County, IL (Final Report - September 2006)

 
 Volume/Number:  2006 September 
 Issuing Agency:   
 Description:  The major objectives of the study were to evaluate the current condition of the lake, investigate potential alternatives for restoring the water quality and enhancing the recreational and aesthetic qualities, and to develop a comprehensive management plan for consideration as Phase 2 Clean Lakes Program implementation project. 
 Date Created:  09 12 2006 
 Agency ID:   
 ISL ID:  000000041020   Original UID: 21083 FIRST WORD: Illinois 
107:

Title:  

Kinkaid Lake TMDL Best Management Practices Implementation: Project Evaluation and Final Report

 
 Volume/Number:  2007 August 
 Issuing Agency:   
 Description:  This report is the final project evaluation for implementing the best management practices plan for Kinkaid Lake TMDL. 
 Date Created:  08 14 2007 
 Agency ID:  Final Assistance Agreement NO. 3190521 
 ISL ID:  000000041021   Original UID: 21084 FIRST WORD: Kinkaid 
108:

Title:  

Lake Bloomington Watershed Plan

 
 Volume/Number:  2008 June 12 
 Issuing Agency:   
 Description:  In the IEPA report, Chapter 1 discusses the rationale for beneficial use 23 designations and impairments for Lake Bloomington which is located in central Illinois. 24 Chapter 2 describes the characteristics of the watershed and water bodies. Chapter 3 25 describes the water quality standards and water quality assessment of existing data. 26 Chapter 4 summarizes the nonpoint and point sources in Lake Bloomington. Chapter 5 27 describes the technical approach used for the TMDL development including modeling 28 approach and calibration. Chapter 6 presents the TMDL components including load 29 allocations. Finally, Chapter 7 briefly describes the implementation plan. 
 Date Created:  06 16 2008 
 Agency ID:   
 ISL ID:  000000041022   Original UID: 21085 FIRST WORD: Lake 
109:

Title:  

Charleston Side Channel Reservoir Restoration Plan: Clean Lake Program Phase 1 Diagnostic Feasibility Study

 
 Volume/Number:  1992 June 
 Issuing Agency:   
 Description:  In the mid 1980's the City of Charleston began receiving complaints about increased fishkills within the reservoir as well as many complaints of foul taste and odors in the potable (drinkable) water supply. Hoping to eliminate these problems, the City initiated a Federal Clean Lakes Program Phase 1 diagnostic/feasibility study of the CSCR. 
 Date Created:  02 10 2010 
 Agency ID:   
 ISL ID:  000000041025   Original UID: 21089 FIRST WORD: Charleston 
110:

Title:  

Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Cedar Lake and Carbondale Reservoir, Carbondale, IL (Final Report - January 2009)

 
 Volume/Number:  2009 January 
 Issuing Agency:   
 Description:  The major objectives of the Phase 1 study were to 1) evaluate the current condition of these water bodies, 2) investigate potential alternatives for restoring the water quality and enhancing the recreational and aesthetic qualities, and 3) to develop a comprehensive management plan. Alternatives in the management plan could then be considered under the Illinois Clean Lakes Program, as a Phase 2 implementation project, or as a project under the Non-Point Source Pollution Control Program (Section 319). 
 Date Created:  01 08 2009 
 Agency ID:   
 ISL ID:  000000041026   Original UID: 21087 FIRST WORD: Illinois 
111:

Title:  

Charleston Side-Channel Reservoir Sedimentation Basin Project Final Report

 
 Volume/Number:  2007 July 10 
 Issuing Agency:   
 Description:  The Charleston Side-Channel Reservoir (CSCR) was the subject of a USEPA Clean Lakes Program (314) diagnostic/feasibility report in 1992. This document developed hydrologic, nutrient and sediment budgets for the CSCR. The CSCR has two watersheds: one that flows directly into the reservoir (the immediate watershed) and one whose water is selectively pumped into the reservoir. The immediate watershed was the number one source of sediment loading, third highest for nitrate loading and fourth for phosphorus loading of the reservoir. The largest source of loading for phosphorus was internal phosphorus cycling. Second largest source was from shoreline erosion. In 1996 a large aeration system was installed in order to curtail internal phosphorus loading. In 1994 the first in a series of erosion control projects was started in an effort to reduce erosion related loading. 
 Date Created:  11 06 2007 
 Agency ID:  Financial Assistance Agreement Number 3190321 
 ISL ID:  000000041028   Original UID: 21091 FIRST WORD: Charleston 
112:

Title:  

Illinois EPA Clean Lakes Program: Phase I Diagnostic / Feasibility Study of Campus Lake, Southern Illinois University, Carbondale, Jackson County, Illinois

 
 Volume/Number:  2004 March 
 Issuing Agency:   
 Description:  The major objectives of this study were to establish the current quality of the lake and to determine the source(s) of any water-borne pollutants to the lake. Based on the findings, potential corrective measures were proposed. The grant also provided support for the direct involvement and training of graduate and undergraduate students, increasing their knowledge and appreciation for the quality of the lake and the lake management profession in general. 
 Date Created:  05 05 2004 
 Agency ID:   
 ISL ID:  000000041030   Original UID: 21093 FIRST WORD: Illinois 
113:

Title:  

Countryside Lake Water Quality Monitoring Program: Final Report

 
 Volume/Number:  2009 October 
 Issuing Agency:   
 Description:  Countryside Lake Association (CLA) started a Lake Stewardship program in 2001 following the Lake Water Quality Study completed by the Lake County Health Department Lake Management Unit (LCHDLMU) in 2000. The LMU study identified Countryside Lake as hyper-eutrophic citing phosphorous as the limiting nutrient. The CLA stewardship program focused its attention on lake water inlet quality to determine whether any of these stormwater drains represented a significant phosphorous input to the lake. The program began with grab sample collections at the major lake inlets in 2002 and 2003 and progressed to ISCO automatic composite water samplers and ultimately to selected ISCO sequential samplers. The early findings documented the baseline water quality for each inlet. 
 Date Created:  11 19 2009 
 Agency ID:  Financial Assistance Agreement Number 3190612 
 ISL ID:  000000041044   Original UID: 21105 FIRST WORD: Countryside 
114:

Title:  

Stream Dissolved Oxygen Improvement Feasibility Study for the East Branch of the DuPage River: Final Report

 
 Volume/Number:  2008 December 
 Issuing Agency:   
 Description:  The East Branch of the DuPage River (East Branch) is listed as an impaired waterway in the 303(d) list. Dissolved oxygen (DO) is listed as one of the causes of impairment. This study was undertaken to address alternative approaches for improving the DO levels on the East Branch during lower flow periods. 
 Date Created:  04 06 2009 
 Agency ID:   
 ISL ID:  000000041045   Original UID: 21106 FIRST WORD: Stream 
115:

Title:  

Stream Dissolved Oxygen Improvement Feasibility Study for Salt Creek: Final Report

 
 Volume/Number:  2009 September 
 Issuing Agency:   
 Description:  In October 2004, the Illinois Environmental Protection Agency (Illinois EPA) issued a completed Total Maximum Daily Load (TMDL) Study for Salt Creek. From this study, the Illinois EPA developed TMDL allocations for various pollutants. The report concluded that significant reductions in biochemical oxygen demand (BOD) and ammonia would be necessary in order for the Illinois Dissolved Oxygen (DO) standards to be achieved in Salt Creek during low-flow, warm conditions, and that the potential removal of one or more existing dams along lower Salt Creek could offer significant water quality improvements. Since the publication of the TMDL report, affected communities, municipal wastewater treatment plant operators, and interested environmental organizations have joined together to form the DuPage River Salt Creek Workgroup (DRSCW). The mission of the DRSCW is to study the East and West Branches DuPage River and Salt Creek watersheds in order to gain a better understanding of environmental impairments that are leading to poor water quality and impacting aquatic life. The initial focus of the DRSCW, for this project, was to develop a computer model that would accurately reflect low-flow, warm stream conditions, particularly DO, along Salt Creek, from which alternatives for improving DO concentrations could be developed. While working on this task it became apparent that better environmental monitoring data were needed. At this point the focus of the Workgroup expanded to include design and implementation of water quality monitoring studies that would generate sound scientific data. 
 Date Created:  09 28 2009 
 Agency ID:   
 ISL ID:  000000041046   Original UID: 21107 FIRST WORD: Stream 
116:

Title:  

Chloride Usage Education and Reduction Program Study: Final Report

 
 Volume/Number:  2007 August 16 
 Issuing Agency:   
 Description:  This Chloride Usage Education and Reduction Program Study addresses the quantity of chloride applied in the watersheds of Salt Creek and the East and West Branches of DuPage River. These watersheds are located in northeastern Illinois, centered in DuPage County. Portions of the watersheds also extend into Cook, Will and Kane Counties. In response to the TMDLs adopted for their watersheds, a group of communities, environmental organizations, publicly owned treatment works and other concerned parties came together to form the DuPage River Salt Creek Workgroup (DRSCW). The DRSCW appointed a Chloride Subcommittee, under whose direction this study was initiated to evaluate current road salting practices and to recommend alternative practices for the reduction of chloride loading to the watersheds, to help comply with the chloride TMDLs. 
 Date Created:  08 15 2007 
 Agency ID:   
 ISL ID:  000000041047   Original UID: 21108 FIRST WORD: Chloride 
117:

Title:  

Hobson Creek Corridor Restoration Project, Phase 3: Tributary 6 to the East Branch DuPage River: Section 319 Project Report

 
 Volume/Number:  2008 September 
 Issuing Agency:   
 Description:  The Hobson Creek Community Council completed the Hobson Creek Corridor Restoration Project, Phase 3 in order to protect against severe streambank erosion, to provide nonpoint source pollution control along Hobson Creek and to improve water quality of the downstream East Branch DuPage River. Installed stream stabilization techniques have provided effective and environmentally sound bank protection and channel stability for the Phase 3 reach. The Hobson Creek Community Council will provide long-term maintenance for the project site. Public involvement to date includes awareness of adjacent homeowners, and numerous trail and parkway visitors near existing signage. 
 Date Created:  12 08 2008 
 Agency ID:  Illinois EPA FAA #3190511 
 ISL ID:  000000041048   Original UID: 21109 FIRST WORD: Hobson 
118:

Title:  

Hobson Creek Corridor Restoration Project, Phase 1: Tributary 6 to the East Branch DuPage River: Section 319 Project Report

 
 Volume/Number:  2004 December 
 Issuing Agency:   
 Description:  The Hobson Creek Community Council completed the Hobson Creek Corridor Restoration Project, Phase 1 in order to protect against severe streambank erosion, to provide nonpoint source pollution control along Hobson Creek and to improve water quality of the downstream East Branch DuPage River. Installed stream stabilization techniques have provided effective and environmentally sound bank protection and channel stability for the Phase 1 reach. The Hobson Creek Community Council will provide long-term maintenance for the project site. Public involvement to date includes awareness of adjacent homeowners, numerous trail and parkway visitors near existing signage, and publication of three newspaper articles, one environmental newsletter article, and three professional trade magazine publications. 
 Date Created:  04 11 2005 
 Agency ID:  Illinois EPA FAA #3190213 
 ISL ID:  000000041049   Original UID: 21111 FIRST WORD: Hobson 
119:

Title:  

Hobson Creek Corridor Restoration Project, Phase 2: Tributary 6 to the East Branch DuPage River: Section 319 Project Report

 
 Volume/Number:  2005 November 
 Issuing Agency:   
 Description:  The Hobson Creek Community Council completed the Hobson Creek Corridor Restoration Project, Phase 2 in order to protect against severe streambank erosion, to provide nonpoint source pollution control along Hobson Creek and to improve water quality of the downstream East Branch DuPage River. Installed stream stabilization techniques have provided effective and environmentally sound bank protection and channel stability for the Phase 2 reach. The Hobson Creek Community Council will provide long-term maintenance for the project site. Public involvement to date includes awareness of adjacent homeowners, numerous trail and parkway visitors near existing signage, a project description and site tour for the River Restoration Principles and Practices Conference sponsored by IL-IN Sea Grant, and publication of three newspaper articles, one environmental newsletter article, and three professional trade magazine publications. 
 Date Created:  11 07 2005 
 Agency ID:  Illinois EPA FAA #3190325 
 ISL ID:  000000041050   Original UID: 21112 FIRST WORD: Hobson 
120:

Title:  

Lyman Woods Streambank Stabilization PSA 2, Phases 1 and 2: Tributary to the East Branch DuPage River: Section 319 Project Report

 
 Volume/Number:  2007 December 
 Issuing Agency:   
 Description:  The Downers Grove Park District completed the Lyman Woods Streambank Stabilization Project, Site Area # 2, Phases 1 and 2. This project will protect against severe streambank erosion, provide nonpoint source pollution control along Lyman Woods Headwaters, and improve the water quality of Lacey Creek and the downstream East Branch DuPage River. Installed stream stabilization techniques have provided effective and environmentally sound bank protection. 
 Date Created:  02 01 2008 
 Agency ID:  Illinois EPA FAA #3190323 
 ISL ID:  000000041053   Original UID: 21114 FIRST WORD: Lyman 
Page: Prev  ...  6 7 8 9 10   ...  Next