Electronic Documents of Illinois
Document Identification
Users should pay particular attention to version identification or dates of publication of documents retrieved. Earlier, possibly superseded, versions of documents are also stored here. TitleIllinois EPA's Ash Impoundment Strategy Progress Report
- In regard to coal combustion residues (CCR) at surface impoundments and coal fired electric generating plants; the Illinois Environmental Protection Agency (Illinois EPA or IEPA) Bureau of Water (BOW) has been implementing a program very similar to the proposed D prime option proposed by U.S. EPA. The corrective actions under the Illinois Pollution Control Boards (Board) groundwater management zone (GMZ) provisions are consistent with the existing closure requirements for solid waste landfills (40 CFR 258). U.S. EPAs proposals for closure of surface impoundments containing coal combustion residuals (CCR) are based on these existing models used for landfills.
Originally Deposited as: 25016
Published By: Phone Number: Language(s): EN-English Volume or Year: 2011 Number or Issue: October Date Created: 10 27 2011 Date Last Modified: 10 27 2011 Librarian Remarks: |
Access This Publication
1. Illinois EPA's Ash Impoundment Strategy Progress Report: October 2011 (ash-impoundment-progress-102511.pdf).Document Size:293859 Software: Adobe PDF Library Version: 9.0 This is part of a series. It is part of Illinois EPA's Ash Impoundment Strategy Progress Report: 46918