Electronic Documents of Illinois
Document Identification
Users should pay particular attention to version identification or dates of publication of documents retrieved. Earlier, possibly superseded, versions of documents are also stored here. TitleAppendices to Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report
- This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment.
Originally Deposited as: 22501
Published By: Phone Number: Language(s): EN-English Volume or Year: Number or Issue: Date Created: 08 03 2007 Date Last Modified: 08 06 2007 Librarian Remarks: |
Access This Publication
1. Appendices to (Appendices.pdf).Document Size:5285813 Software: Acrobat Distiller Version: 7.0.5