Electronic Documents of Illinois
Document Identification
Users should pay particular attention to version identification or dates of publication of documents retrieved. Earlier, possibly superseded, versions of documents are also stored here. TitleCharleston Side-Channel Reservoir Sedimentation Basin Project Final Report
- The Charleston Side-Channel Reservoir (CSCR) was the subject of a USEPA Clean Lakes Program (314) diagnostic/feasibility report in 1992. This document developed hydrologic, nutrient and sediment budgets for the CSCR. The CSCR has two watersheds: one that flows directly into the reservoir (the immediate watershed) and one whose water is selectively pumped into the reservoir. The immediate watershed was the number one source of sediment loading, third highest for nitrate loading and fourth for phosphorus loading of the reservoir. The largest source of loading for phosphorus was internal phosphorus cycling. Second largest source was from shoreline erosion. In 1996 a large aeration system was installed in order to curtail internal phosphorus loading. In 1994 the first in a series of erosion control projects was started in an effort to reduce erosion related loading.
Originally Deposited as: 21091
Published By: Phone Number: Language(s): EN-English Volume or Year: 2007 Number or Issue: July 10 Date Created: 11 06 2007 Date Last Modified: 12 03 2009 Librarian Remarks: |
Access This Publication
1. (20120403194741_cscr-sediment-basin-project.pdf).Document Size:2276001 Software: Acrobat PDFWriter Version: 5.0