Electronic Documents of Illinois
Document Identification
Users should pay particular attention to version identification or dates of publication of documents retrieved. Earlier, possibly superseded, versions of documents are also stored here. TitleTotal Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final
- This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment.
Originally Deposited as: 20904
Published By: Phone Number: Language(s): EN-English Volume or Year: 2009 Number or Issue: October 23 Date Created: 11 24 2009 Date Last Modified: 11 24 2009 Librarian Remarks: |
Access This Publication
1. Total Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final (20120323191440_kankakee-final-tmdl.pdf).Document Size:14830239 Software: Acrobat Distiller Version: 6.0.1