Electronic Documents of Illinois
Document Identification
Users should pay particular attention to version identification or dates of publication of documents retrieved. Earlier, possibly superseded, versions of documents are also stored here. TitleIL 158 and I-64 in St Clair County
- The Illinois Department of Transportation today announced that effective Monday, November 7, 2011, width restrictions will be encountered on the I-64 ramps to Illinois 158. Traffic will be guided through the work zone utilizing flaggers, traffic control devices and traffic control signing. Please use extreme caution while traveling through the work zone. These lane closures are necessary to repair the existing pavement. This work should be completed by Friday, November 11, 2011, weather permitting. The contractor on this project is Keeley and Sons Construction from East St. Louis, Illinois. Joseph G. Gasaway is the Supervising Field Engineer for the Illinois Department of Transportation in the area. If you have any questions concerning this project, you may contact him at 618/346-3354.
Originally Deposited as: 19492
Published By: Phone Number: Language(s): EN-English Volume or Year: 2011 Number or Issue: November 1 Date Created: 10 31 2011 Date Last Modified: 10 31 2011 Librarian Remarks: |
Access This Publication
1. IL 158 and I-64 in St Clair County (20120110184636_76E80rel10-31-11.doc).Document Size:188416 Software: Microsoft Word Version: 97-2003 This is part of a series. It is part of Illinois Department of Transportation District Press Releases: 33974