Electronic Documents of Illinois
Document Identification
Users should pay particular attention to version identification or dates of publication of documents retrieved. Earlier, possibly superseded, versions of documents are also stored here. TitleLake Carlinville Atrazine Total Maximum Daily Load (TMDL): Draft Report
- This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment.
Originally Deposited as: 172114
Published By: Phone Number: Language(s): EN-English Volume or Year: 2013 Number or Issue: August Date Created: 08-12-2013 Date Last Modified: 08-14-2013 Librarian Remarks: |
Access This Publication
1. Lake Carlinville Atrazine Total Maximum Daily Load (TMDL) (lakecarlinvilletmdl.pdf).Document Size: Software: Acrobat Distiller Version: 10.1.7